Subdiview

Approved and pre-construction near Lakeland, FL

The Highlands Club

747 approved homes on about 300 acres in unincorporated Polk County

The county commission approved The Highlands Club in January 2026, on appeal, after the Planning Commission had approved it two months earlier. The plan is 747 single-family homes on roughly 300 acres west of US Highway 98, wrapped around a lake of about 28 acres. No builder has been assigned to a single lot. Nothing has been released to the public yet.

Area
South Lakeland
Homes
747 approved
Site
About 300 ac
Approved
Jan 2026

At a glance

The Highlands Club fast facts: approved on appeal, January 2026

Here is what is on the public record today and what has not been released. Anything marked not yet released, join the interest list and it goes out the day it drops.

Area
South Lakeland area, FL
County
Unincorporated Polk County
Site
About 300 acres
Approved plan
747 single-family homes
Zoning
Planned Development
Approved
By county commission, January 2026
Lot widths
678 lots at 50 ft, 69 at 130 ft
Minimum lot size
6,000 square feet
On site
Crews Lake, about 28 acres
Home builder
None named yetGet notified
Home plans and sizes
Not yet releasedGet notified
Pricing
Not yet releasedGet notified
Model home opening
Not yet announcedGet notified
HOA and CDD
Not yet setGet notified

Details on this page are compiled from public entitlement records and are targets, not commitments. Pricing, floor plans, home counts, and timing have not been released by the builder and are subject to change without notice.

Where it is

West of US Highway 98, south of Crews Lake Drive, west of Yarborough Lane, south of County Road 540-A and east of McCall Road. Touchstone is under construction to the east, Treymont lies west, Wind Meadows South is to the south. Unincorporated county land, not city limits. No street addresses yet.

View the area on Google Maps

Approved by the county. No builder assigned.

That gap is the whole reason this page exists. 747 homes have cleared a contested approval and an appeal, and not one homebuilder has been named to a single lot. Add your name, email and phone and you will hear when a builder is announced, a phase is priced, or a model opens, and be registered as represented before your first visit.

Get notified

About the plan

What was actually approved

The Highlands Club is a Planned Development on approximately 300 acres of unincorporated Polk County. The approved program is 747 single-family homes. The county's own staff described the surrounding area as essentially an extension of south Lakeland, which is a fair description of what this corridor has become: a band of large production subdivisions filling in west of US Highway 98 between Lakeland and Bartow.

The lot mix is the most revealing detail in the file. 678 of the 747 lots are 50 feet wide, and 69 are 130 feet wide, with a minimum lot size of 6,000 square feet. A community built overwhelmingly on 50-foot lots with a small band of 130-foot homesites is a recognizable pattern: an attainable-price core with a limited premium tier, usually positioned along water or open space. Here there is an obvious candidate for that frontage, because the site contains a lake of roughly 28 acres.

The approval was not a formality. The Planning Commission approved it in November 2025 over a dissenting vote, the decision was appealed, and the Board of County Commissioners reheard the case fresh in January 2026 and approved it, signing a Final Order. The practical consequence for a buyer is that the entitlement standing today is the county commission's own, which is the stronger footing of the two.

One figure we will not pin down for you: the density. The county's staff report and the applicant's own narrative, filed in the same case, state two different dwelling-units-per-acre figures. Rather than pick one and present it as fact, we publish the inputs that do not conflict: 747 homes, approximately 300 acres, 6,000 square foot minimum lot.

The part nobody has untangled

Four different things near here are called Crews Lake

If you have been researching this area you have probably already hit this, and it is the single most confusing thing about the corridor. Within roughly two miles of The Highlands Club there are four distinct things carrying the Crews Lake name, and mixing them up will send you to the wrong place.

The lake itself. A body of water of about 28 acres sits inside The Highlands Club. That is on this property.

Crews Lake Woods. An existing, built subdivision nearby. Homes there resell on the open market today, which means search results for the name are dominated by listings that have nothing to do with any new community.

A separate 400-home approval. A different Planned Development, on about 151 acres, with different owners and a different filing, approved on its own track in 2026. It shares this road network. It is not part of The Highlands Club and it is not the same project.

Crews Lake Haven. An unrelated project elsewhere in Polk County whose utility improvements the county accepted in 2025.

Why this matters to you: when builder names and pricing eventually appear for one of these, the announcement will be easy to misattribute to another. We track them as separate records, on separate pages, so that the alert you get is about the community you actually asked about.

Location

The US 98 corridor between Lakeland and Bartow

The Highlands Club sits west of US Highway 98, south of Crews Lake Drive, west of Yarborough Lane, south of County Road 540-A and east of McCall Road. Its neighbors are the most useful orientation available: Touchstone is under construction immediately to the east, Treymont lies west, and Wind Meadows South is to the south. In other words this is not raw land in isolation; it is the next parcel in a corridor that is already being built out.

It is unincorporated county land, not inside the City of Lakeland or the City of Bartow. That is a real distinction rather than a technicality. Unincorporated property pays no city millage, receives county rather than city services, and is reviewed by the county commission. Mailing addresses in this pocket commonly carry a Lakeland designation anyway, which is why buyers routinely assume they are buying inside the city when they are not.

We do not publish drive times to downtown Lakeland, to Bartow, to Tampa or to Orlando, because The Highlands Club has no assigned address or coordinates yet and any mileage would be invented precision. What is true and needs no number: the property sits immediately west of US 98, which is the main north-south route through this part of the county.

Market context

What to expect on cost, and what nobody knows yet

The Highlands Club has no price, because it has no builder. Rather than invent a range, here is the cost structure that will apply and the parts of it that are genuinely unknown today.

Property tax. As unincorporated Polk County land, the bill combines county millage, the school board, the water management district and other special districts, with no city millage component. Buyers comparing this to an otherwise similar home inside Lakeland city limits should expect a different composite rate. Pull the current figure from the Polk County Property Appraiser rather than relying on any number quoted in a listing.

Community development district. Many Florida communities of this scale are financed through a CDD, which issues bonds for roads, water, sewer and stormwater and repays them through an annual assessment on your tax notice, separate from and on top of HOA dues. It can run to thousands of dollars a year. No such district has been established or published for The Highlands Club, so there is no figure to quote and anyone offering you one is guessing.

Lot premiums. Worth anticipating on this particular site. With 69 wider homesites among 747 lots and a substantial lake on the property, expect the waterfront and wider lots to carry premiums once a builder prices the community. That is a structural prediction from the approved lot mix, not a price, and we are labeling it as such.

What you need to know

Buying new construction, the smart way

Whoever ends up building the homes at The Highlands Club, the same rule applies: the person at the model's sales desk works for the builder, not for you. They are usually helpful and usually honest, and they still represent the seller's side of the transaction. You are allowed, and smart, to have your own representation, and in almost every case it costs you nothing, because the builder budgets a cooperating commission into the deal whether you bring an agent or not.

The catch is timing. Most builders require your agent to register you on your first visit. Tour or sign in alone and bring an agent later, and the builder can refuse to recognize them, and you lose your representation for that community. Get connected before you tour, have your agent register you, and let them read the contract, the addenda, and, in Florida, the CDD disclosure.

On a 747-home community there is a second advantage to being on the list early. A project this size releases in phases, and the first release in each phase usually carries the best homesites and the most pricing flexibility. With a lake on the property, the genuinely scarce lots here will go early.

Subdiview is not affiliated with, endorsed by, or sponsored by any homebuilder, the developer, or Polk County. No homebuilder has been named for this community; the development parties are identified here because they are the applicant and owners of record in the county's published entitlement documents, which is a statement of fact about the public record and not a representation of any relationship. Community names and marks are the property of their respective owners and are used for identification only. Subdiview is operated by a real estate broker licensed in Illinois. We are not your agent, we do not represent you, and we perform no real estate brokerage services in this state. No one at Subdiview is licensed in this state. If you join an interest list, your information is referred to a real estate professional licensed in the state where the property is located, who will contact you directly. We are compensated by that professional's brokerage, not by you. All community details on this page are compiled from public records, are targets rather than commitments, and are subject to change without notice.

Questions and answers

The Highlands Club FAQ

What is The Highlands Club?

The Highlands Club is an approved Planned Development covering about 300 acres of unincorporated Polk County, in the area the county's own staff describe as essentially an extension of south Lakeland. The approved plan is 747 single-family homes. The county commission gave it final approval in January 2026. Nothing is built, no builder has been assigned, and nothing is for sale.

Where exactly is it?

West of US Highway 98, south of Crews Lake Drive, west of Yarborough Lane, south of County Road 540-A and east of McCall Road. It is unincorporated county land rather than city limits, sitting between south Lakeland and Bartow. Its immediate neighbors are useful landmarks: the Touchstone subdivision is under construction to the east, Treymont lies to the west, and Wind Meadows South is to the south. There are no street addresses or platted lots yet.

Is this the same thing as the Crews Lake project?

No, and this trips people up constantly, so it is worth being precise. There are two separate approved developments on the same stretch of road network west of US 98. This one is The Highlands Club, about 300 acres and 747 homes. The other is a 400-home Planned Development on about 151 acres, approved separately in 2026, with different owners and a different applicant filing. Adding to the confusion, a roughly 28-acre lake called Crews Lake sits inside The Highlands Club itself, there is an existing subdivision called Crews Lake Woods nearby, and an unrelated project called Crews Lake Haven exists elsewhere in the county. Four different things share that name in a two-mile radius. We keep a separate page for the 400-home project.

Who is building the homes?

Nobody yet. No homebuilder is named in the staff report, the Final Order, the site plan or any coverage. The parties on record are a land-development partnership and the families who own the land, which is the normal pattern: an entitlement group takes the property through approval and horizontal development, then sells lots to homebuilders. Builder names typically surface at or shortly before the plat stage. Catching that moment is the entire purpose of the list on this page.

Was there really an appeal? What happened?

Yes, and it is a genuinely useful thing to understand about this project. The Planning Commission approved the development in November 2025, but not unanimously. That decision was then appealed, which in Polk County triggers what is called a de novo hearing: the Board of County Commissioners rehears the matter fresh rather than simply reviewing the earlier decision. The Board heard it in January 2026 and approved it, and a Final Order was signed. So the approval standing today is the county commission's own, which is the stronger of the two.

What will the homes be like?

The approved lot mix is the most concrete thing on the record, and it is more informative than it first looks. Of the 747 lots, 678 are 50 feet wide and 69 are 130 feet wide, with a minimum lot size of 6,000 square feet. That is a community built mostly around a narrower, more attainable production lot, with a small number of substantially wider homesites, which in practice usually means a premium tier along an amenity or a water feature. Beyond lot geometry, nothing is released: no floor plans, no square footages, no elevations and no price bands, because no builder has been assigned.

How dense is it?

We are deliberately not publishing a density number, and the reason is instructive about how carefully you should read development coverage. The county's staff report and the applicant's own narrative in the same case file state two different densities. Both are primary documents. Rather than pick the one we prefer, we will give you the underlying facts, which do not conflict: 747 homes on approximately 300 acres, with a 6,000 square foot minimum lot. You can judge from that, and it is a fairly typical suburban production density for this corridor.

Is it in the City of Lakeland?

No. It is unincorporated Polk County. That distinction is worth money to you. Unincorporated property does not pay city millage, so the tax picture differs from an otherwise identical home inside city limits, and county rather than city services apply. It also means the county commission, not a city council, is the body that approved it and will handle subsequent reviews. Mailing addresses in this area commonly carry a Lakeland designation even though the land is not in the city, which is a frequent source of confusion.

What schools would serve it?

Polk County Public Schools assigns attendance zones by physical address, and no addressed home exists here yet, so any school named today would be a guess. This corridor has been absorbing significant new rooftops, with Touchstone under construction immediately to the east and other approved projects nearby, so expect boundaries to be reviewed as these communities deliver. Run the specific address through the district's locator once addresses are assigned.

What about taxes and assessments?

As unincorporated Polk County land, your bill would combine county millage, the school board, the water management district and other special districts, with no city millage. Many Florida communities of this size also carry a community development district, which finances infrastructure through bonds repaid by an annual assessment on your tax notice, separate from and on top of HOA dues. Nothing of that kind has been established or published for The Highlands Club, so there is no figure to quote. Florida has no state income tax, which is often what starts this arithmetic for relocating buyers.

When will homes actually be available?

No date has been announced. What the record tells us about sequence is that the project has its Planned Development approval but has not yet cleared the county's Level 2 review, the stage where detailed site and subdivision engineering is examined; the staff report notes that a traffic study is not required until that submittal. Platting, infrastructure and builder assignment all follow. Treat any date you encounter as a target rather than a commitment.

How do I get updates on The Highlands Club?

Join the interest list on this page. We read Polk County's Planning Commission and county commission records directly, which is how a 747-home approval ended up documented here while there is still nothing to buy and no builder to call.

Be first in line

Get on the The Highlands Club interest list

747 homes approved on appeal, a lake on the property, and not one builder named to a single lot. That is exactly why the list is worth being on: when a builder is announced or a phase is priced, the people on it hear first.

Joining costs nothing, creates no brokerage relationship, and does not obligate you to anything. When you are ready, a real estate professional licensed in Florida will reach out and can register you as represented before your first visit to a sales office.

Joining the interest list is free, creates no brokerage relationship, and does not obligate you to anything. Subdiview is operated by a real estate broker licensed in Illinois and is not licensed in Florida. Your information is referred to a real estate professional licensed in Florida, who will contact you directly and can register you as represented before your first visit to a sales office.