Approved and permitted in Haines City, FL
Lake Eva Estates
31 homes on just under sixteen acres beside Lake Eva Park
The water management district has issued the construction permit for this site, and the city has taken up the preliminary plat for a thirty-one-home single-family subdivision. What has not happened is the recording of a final plat, so the lots and the street names do not exist yet, and no builder is named in any record we could find. At roughly two homes to the acre on in-town land beside the city park, this is a different shape of project from most new construction around here. Here is the record before any price list exists.
- Homes
- 31 detached
- Acres
- Just under sixteen
- Density
- About two an acre
- Built so far
- None
At a glance
Lake Eva Estates fast facts
The figures below come from the regional water management district's own permit dataset, the city commission's agenda record and its attachments, the county appraiser's parcel and subdivision records tested by location rather than by name, a county permit search run with a working control, the federal geocoder, and a query of the federal flood layer run across the whole permit footprint as well as at each parcel centre. Everything carries an as-of date of October 2026. Where a line is marked unresolved, we could not establish it from a primary source and will not guess at it. On this project that list is longer than usual, and we would rather show you the gaps than paper over them.
- Area
- Off 10th Street beside Lake Eva Park, inside the City of Haines City
- Jurisdiction
- City of Haines City, not unincorporated Polk County
- Status
- Approved and permitted to begin site work. Not yet platted
- Approval instrument
- An issued water management district construction permit, plus a city preliminary plat resolution
- Permit issued
- July 2026, and it runs for five years
- Homes
- 31 single-family detached homes, as put to the city
- Size
- Just under sixteen acres across two adjoining parcels
- Density
- About two homes to the acre, which is low for the area
- Setting
- In-town infill beside an established neighbourhood, not a greenfield masterplan
- Distance to downtown
- Under a mile from the city centre
- Owner of record
- A local single-purpose land entity, not a seller here yet
- Community development district
- None found, and a community this size would rarely have one
- Flood
- Both parcel centres mapped outside the special flood hazard area
- School district
- The county district, assigned countywide
- Recorded plat
- None yet. The land is still two undivided parcels
- Street names
- Not yet created. Streets are named on the plat, which has not recorded
- Builder
- Not established. No builder is named in any record we could find
- Lot sizes and floor plans
- Unresolved. Nothing published
- Homeowners association
- Unresolved. None recorded yet, but one is normal at this scale
- Total millage
- Unresolved. Not read this run, so no tax estimate is published
- Age restriction
- No evidence of one, and not formally established either
- Pricing, model, sales centre
- None exist. Nothing is for sale
Unresolved, ask before you buy
Unresolved, ask before you buy
Unresolved, ask before you buy
Unresolved, ask before you buy
Unresolved, ask before you buy
Unresolved, ask before you buy
Unresolved, ask before you buy
Unresolved, ask before you buy
Where it stands
Permitted to move dirt, not yet platted
The regional water management district has issued the environmental resource permit for this site, and we checked the one detail that actually decides what such a permit means. There are kinds of district permit that authorise no construction whatsoever, and one of them has been mistaken for a construction approval on a project in this county before, producing a stage reading that was wrong by two full steps. This is not one of those. It is the construction-authorising kind, it names this project by name, it is categorised as a residential activity, it carries an issue date in July 2026 and it runs for five years. Its mapped footprint matches the two parcels on the ground almost exactly.
Separately, the city commission took up a resolution for the preliminary plat, and the agenda for that meeting carried a revealing set of attachments: the approved district permit, a transportation impact study approved in the spring, a non-binding school concurrency letter from the county school district, and a lot layout. Those are the documents a project assembles when it is moving towards construction rather than sitting on a shelf. That agenda item is also where the thirty-one-home single-family configuration comes from.
We have to be careful about one thing there, and we would rather flag it than smooth it over. We could not confirm how the commission voted, because the minutes sit in a file we could not open. So throughout this page the thirty-one-home configuration is described as what the city was asked to approve rather than as something we watched it adopt. The project does not depend on that vote in any case: the issued construction permit from the state agency stands on its own, and an approved transportation study and a school concurrency letter are not things a project collects speculatively.
What has not happened is the important part. No final plat has recorded, which means the individual lots do not legally exist yet and the streets have not been named. We tested that by location rather than by name, which matters: a name search for a plat returns nothing in plenty of cases where a plat exists under a name nobody used upstream, and that exact mistake once hid an already-selling community from this pipeline. Tested properly, the only plats covering this ground are two replats from the 1920s. It is genuinely unplatted. The permit also carries no recorded commencement of construction and we could not read a city site-work permit, so the accurate statement is that this project is permitted to begin site work rather than that site work is under way.
The honest gaps
No builder is named, and no lots exist yet
On most communities at this stage we can at least tell you who is building. Here we cannot, and we are not going to guess. The permit holder and the owner of both parcels is a local single-purpose land entity formed in 2025, and its entire holding in this county is this one site. No builder is named on the district permit, on the city agenda item, in the county permit records or anywhere we could find online.
There is an obvious inference available and we are deliberately not publishing it. A thirty-one-lot in-town subdivision held by a small local entity is a different animal from a four-hundred-lot greenfield site optioned by a national builder's land arm, and the records here carry none of the signatures those national land companies leave. But a plausible story about who is likely to build this is not a fact, and we publish facts. When a builder is named, that is one of the first things we will tell you.
The same discipline applies to the rest. There are no lot dimensions, because lots are created by the plat and the plat has not recorded. There are no street names for the same reason. There are no floor plans, no square footages, no price and no sales operation. No homeowners association has been recorded yet, which is not the same as there never being one: a community this size will almost certainly have one to hold the stormwater pond and any common tract, and it will have dues nobody has published. We also did not read the current combined millage for this district, so there is no tax estimate on this page at all.
One thing we can report positively, because it was worth testing. This project is not an invented name. A community name that appears in no government filing, back-formed from a nearby road or landmark, is something we refuse to build a page for, and with a lake and a city park both called Lake Eva next door this was a live possibility. It is not the case here: the name is the applicant's own filed project name in two separate government records. It is not a recorded plat name, though, so treat it as what the project is commonly called rather than as an official designation, and expect a retail brand that may differ.
We will tell you when the plat records and a builder is named
Those two events will settle the lot dimensions, the street names and who you are actually dealing with, and they usually arrive within months of each other. Neither has happened yet, which means there is nothing to lose your place in and no deposit to put down.
What makes it unusual
Two homes an acre, in town, next to the park
Most new construction in this county is a greenfield subdivision on a highway corridor at four to six or more homes to the acre. This is thirty-one homes on just under sixteen acres, which is about two to the acre, on an in-town infill parcel. That combination is genuinely uncommon here and it is the main reason this page exists.
Be careful how you read the density figure, though, because it is easy to over-read. Gross density across a whole site includes the roads, the stormwater ponds and any common area, so the individual lots will be meaningfully smaller than two to the acre suggests, and until the plat records nobody can tell you the dimensions. Treat it as a reliable signal about the character and feel of the place rather than as a lot size, and ask for the plat dimensions the moment they exist.
The location is the other half of it. The site sits off 10th Street immediately beside the city's main park at Lake Eva and under a mile from the city centre, adjoining an established residential area of owner-occupied homes, some of them substantial. The city has also been actively investing in the lake and park system next door, including work on the lake's infiltration basin during 2026, which is the sort of spending that signals the park is being maintained as an asset rather than left to decline.
The tradeoff is real and runs in both directions. You get mature surroundings, established trees, a genuine park at the end of the road and a walkable distance to a real downtown. You do not get a clubhouse, a resort pool, a gate or an amenity programme, because on a thirty-one-home site there is no economic basis for any of it. If what you want is a lifestyle community with a lagoon and a fitness centre, this is not that and never will be. If what you want is a new house in an old neighbourhood, this is one of very few chances to get one. One point we want to be explicit about: being beside a park on a lake is not the same as being on the lake. We could not establish that any of this land fronts or overlooks the water, so do not assume a lake view.
Water, wind and premiums
Outside the hazard area, with a caveat worth reading
This is the one answer on this page we have deliberately refused to round off. At both parcel centres the federal mapping returns minimal hazard, so the land is mapped outside the special flood hazard area at those points. That is the reassuring part and it is accurate.
But when we queried the whole permit footprint rather than a single point, the result returned both a minimal-hazard area and a high-hazard area carrying a published base flood elevation, and that high-hazard mapping runs immediately adjacent along the lake shoreline next door. A single-point query is the standard way to get a falsely clean answer, which is why we ran it both ways. The honest statement is therefore that the parcel centres read as outside the hazard area while a mapped hazard area sits right beside the site.
What that means practically. On a thirty-one-lot subdivision on a sloping in-town parcel beside a lake, the lot-by-lot answer is the only one that will matter to you, and it cannot exist until the plat records and your lot exists. Get a determination for your specific lot at that point, confirm the effective flood map panel at closing, and ask to see the approved grading and drainage plan rather than relying on any site-wide statement, including ours. Mapped outside the hazard area means a lender will not force flood insurance; it does not mean water never stands anywhere on a property.
On insurance generally, new construction here should price well for structural reasons. Florida requires insurers to credit verified wind-mitigation features, and a house built to the current code earns most of them automatically: the roof covering and deck attachment, the roof-to-wall connections, the roof shape and the opening protection. Roof age is the single biggest underwriting question in this state, so a brand-new roof matters more than almost anything else. On the wider market, the state-backed insurer filed a statewide average multiperil rate decrease of nearly nine per cent in the spring of 2026 and several private carriers filed decreases in the same window. We gathered no premium figures for this site and will publish none.
Costs and the town
No district found, and a town with an actual centre
We looked for a community development district and found none, and on a project this size that is what you would expect: districts exist to finance infrastructure at a scale where issuing bonds makes sense, and thirty-one homes is far below it. That is worth real money, because a district assessment is a second line on a Florida tax bill that typically runs twenty to thirty years, and it is the most common unpleasant surprise in Florida new construction. Treat it as a strong negative finding rather than a certified absence, and get written confirmation.
On property tax, there is no estimate on this page and that is deliberate. The site is two undivided raw parcels today with no building value at all, so the current roll figure describes an empty field. A completed home is assessed as of the January the first following completion, so the first full-year bill is the first year the building appears on the roll, and we did not read the current combined millage for this district this run. The site is inside the city, so a municipal levy applies on top of the county and school levies, and an estimate built from an unincorporated comparison elsewhere in the county will understate it. Florida's additional homestead exemption of fifty-one thousand four hundred and eleven dollars is set statewide by Florida law rather than by this county, and applies only from the January after you establish residency.
As for the town itself, this is working inland Florida in the middle of the citrus ridge, not a beach town and not a theme-park town, though it sits within reach of both. The old centre is a genuine small downtown with civic buildings and a street grid, and this site is under a mile from it. The main north-south highway and state road pair run up the spine of the peninsula here with the interstate to the north, which is what puts both big metro areas within range, and that same corridor is the engine of the growth: this is one of the faster-growing parts of the state and large subdivisions are going up along the highway.
We have printed no drive times, because we did not measure any, and a published figure on a corridor growing this fast would be stale within a year. The honest tradeoffs: you are a long way from a coast, the summers are hot and the afternoon storms are real, and traffic on the main corridor has outgrown the road network. Against that you are buying at an inland price point in a town with a real centre, on a site beside a park rather than behind a highway sound wall. Schools are assigned at county district level, which covers the whole county; we will not name individual schools, because the assignment follows an address and no address here exists yet.
Buying new, with somebody on your side
What to settle before there is anything to sign
There is no sales operation at this community, so nothing here is urgent. That is precisely why it is the right moment to get your own representation sorted out, rather than the moment you are standing in a model home with a reservation form in front of you. You can have a Florida agent on your side, touring with you, reading the contract line by line and pushing for every incentive, upgrade and closing-cost credit the builder will give, and on new construction the builder already budgets that fee whether you bring somebody or not. The catch is purely one of timing and registration: builders generally require your agent to be named from your very first visit, and if you register yourself first the agent often cannot be added afterwards.
On a project this early there is a particular version of that risk worth naming. When the builder here is announced, it may well be a local or regional company rather than a national one, and smaller builders vary far more in contract terms, warranty administration and specification than the nationals do. So read the parts nobody reads: what happens to your deposit if the schedule slips, how long the builder may delay before you have a remedy, whether the price is fixed or subject to escalation, what the specification actually includes, and who administers the warranty and whether it transfers on resale. Ask for completed addresses you can go and look at. We did not search Florida regulatory enforcement records or civil dockets for any builder, owner or entity connected to this community, so read the absence of any such note as unchecked rather than clean.
And whenever it does get built: hire your own independent inspector at pre-drywall, again at the final walkthrough, and once more before the one-year warranty expires. Read the limited warranty booklet before you sign rather than after. Get a lot-specific flood determination, which on this particular site matters more than usual, and get the association and district questions answered in writing.
Subdiview is not affiliated with, endorsed by, or sponsored by any homebuilder, owner, applicant or permit holder connected to Lake Eva Estates, the City of Haines City, or Polk County. The owner and permit holder is identified by role here because it is named in the public record for this community, which is a statement of fact and not a representation of any relationship, and it is not offering anything for sale here. No builder is named on this page because no builder is named in the record. Community names and marks are the property of their respective owners and are used for identification only. Subdiview is operated by a real estate broker licensed in Illinois. We are not your agent, we do not represent you, and we perform no real estate brokerage services in this state. No one at Subdiview is licensed in this state. If you join an interest list, your information is referred to a real estate professional licensed in the state where the property is located, who will contact you directly. We are compensated by that professional's brokerage, not by you. We did not search civil dockets. Approval, permit, district, tax, flood and association details on this page carry the dates shown, are as issued, approved or reported rather than as offered for sale, and are subject to change without notice.
Questions and answers
Lake Eva Estates FAQ
Is Lake Eva Estates actually approved?
Yes, and we want to be precise about which approvals exist because at this stage the distinction matters. The regional water management district has issued the environmental resource permit for this site, and it is the construction-authorising kind rather than the sort of wetland determination that permits no work at all. We checked that specifically, because a permit of the wrong type has been mistaken for a construction approval in this county before. It names this project by name, it is marked approved with an issue date, it is categorised as a residential activity, and it runs for five years. Separately, the city commission took up a resolution for the preliminary plat, and the agenda for that meeting carried the approved district permit, an approved transportation study, a school concurrency letter from the county district and a lot layout. So: an issued construction permit from a state agency, and a local approval process under way. What has not happened is the recording of a final plat.
What exactly is still missing?
Three things, and we would rather list them than let silence imply otherwise. First, the final plat has not recorded, which means the individual lots do not legally exist yet and the streets have not been named. Second, no builder is named anywhere we could look: not on the district permit, not on the city agenda item, not in the county permit records, and not online. The land is held by a local single-purpose entity formed in 2025, which is a normal way to hold land but tells you nothing about who will build. Third, we could not confirm the vote on the city resolution, because the minutes sit in a file we could not open. So we describe the 31-home single-family configuration as what the city was asked to approve rather than as something we watched it adopt. The project does not rest on that vote: the issued construction permit stands on its own.
How many homes, and how dense is it?
Thirty-one single-family detached homes on just under sixteen acres, which is the configuration put to the city. That works out at roughly two homes to the acre, and here is why we keep drawing attention to it: that is genuinely low density for new construction in this county. A great deal of what gets built around here runs at four, six or more homes to the acre on forty-foot lots. Two to the acre is a different kind of product. We have to be careful, though, because the final plat has not recorded and until it does nobody can tell you the individual lot dimensions. Gross density across a site includes the roads, the stormwater ponds and any common area, so the lots themselves will be smaller than a simple division suggests. Treat the low density as a promising signal about the character of the place rather than as a lot size, and ask for the plat dimensions the moment they exist.
What are the streets called?
They do not have names yet, and that is a real answer rather than a gap in our research. Streets inside a subdivision are named on the plat, and this plat has not recorded. The only street names associated with this site today are the pre-existing public roads it adjoins, 10th Street and Pointe Eva. We mention this because on most of our pages the new street names are the most useful thing we can give you, since they are what makes a community findable before it has a brand. Here they simply do not exist yet. When the plat records, the street names will appear with it, and that moment is also usually the point at which address assignments and the first permits follow.
Where is it, and what is it next to?
This is the part that makes the project interesting, and it is unusual for new construction in this county. The site is in-town infill off 10th Street, immediately beside the city's main park at Lake Eva, and under a mile from the city centre. It is not a greenfield site on a highway: the neighbours are an established, built-out residential area of owner-occupied homes, some of them substantial. The city has also been actively investing in the lake and park system next door, including work on the lake's infiltration basin during 2026. What that means for a buyer is a different set of tradeoffs from the usual choice. You get mature surroundings, trees, a real park at the end of the street and a walkable distance to downtown. You do not get a clubhouse, a resort pool, a gate or a community amenity programme, because on a thirty-one-home site there is no economic basis for any of that. One caution we want to be explicit about: being beside a park on a lake does not mean this is lakefront land, and we could not establish that any of it fronts or overlooks the water. Do not assume a lake view.
Does it flood?
At both parcel centres the federal mapping returns minimal hazard, so the land is mapped outside the special flood hazard area at those points. But this one needs a more careful answer than most, and we are not going to round it off. When we queried the whole permit footprint rather than a single point, the result returned both a minimal-hazard area and a high-hazard area with a published base flood elevation, and that high-hazard mapping runs immediately adjacent along the lake shoreline next door. So the honest statement is that the parcel centres read as outside the hazard area while a mapped hazard area sits right beside the site. On a thirty-one-lot subdivision on a sloping in-town parcel next to a lake, the lot-by-lot answer is the only one that will actually matter to you. Get a determination for your specific lot once the plat records and the lot exists, confirm the effective flood map panel at closing, and ask to see the approved grading and drainage plan rather than relying on any site-wide statement, including ours.
Is there a community development district?
We found none. There is no city ordinance establishing one and no county record of one for this site, and on a thirty-one-home project a district would be very unusual: districts exist to finance infrastructure at a scale where bonding makes sense, and thirty-one homes is far below that. That is good news, because a district assessment is a second line on a Florida tax bill that typically runs for twenty to thirty years. Two caveats. This is a negative finding rather than a certified absence, so get written confirmation before you sign. And no homeowners association has been recorded yet either, which is not the same as there never being one: a community of this size will almost certainly have an association to hold the stormwater pond and any common tract, and when it is created it will have dues. No figure exists to quote, and we will not invent one.
What will the taxes be?
We are not going to publish a number, and we want to explain why rather than just decline. The site is two undivided raw parcels today, carrying a land-only assessment and no building value at all, so the current figure on the county roll describes an empty field rather than a house. A completed home in Florida is assessed as of the January the first following its completion, which means the first full-year bill is the first year the building itself appears on the roll. On top of that, we did not read the current combined millage for this district this time around, and we would rather give you nothing than a rate we have not verified. What we can tell you is the structure: the site is inside the city, so a municipal levy applies on top of the county and school levies, and a tax estimate built from an unincorporated comparison elsewhere in the county will understate what you pay here. Florida's additional homestead exemption of fifty-one thousand four hundred and eleven dollars is set statewide by Florida law rather than by this county, and it applies only from the January after you establish residency.
Is this a short-term rental or resort project?
No, and we screened for it deliberately rather than assuming, because this county has a large short-term-rental and resort belt and a lot of what looks like ordinary new construction near here is not. We found no condominium declaration, no resort or timeshare instrument, no hotel-condominium filing and no multifamily site plan for this land. The district permit categorises the activity as residential, one of the two parcels carries a vacant-residential use code, and the project was put to the city as a single-family residential subdivision. Geographically it is also in the wrong place to be that kind of product: the vacation-rental belt in this county sits out along the main highway corridor several miles away, while this is an in-town infill parcel a short walk from a city park. It reads as ordinary for-sale housing in an established neighbourhood, and the records support that.
What is Haines City actually like?
It is a working inland Florida town in the middle of the citrus ridge, not a beach town and not a theme-park town, even though it sits within reach of both. The old centre has a genuine small downtown with civic buildings and a street grid rather than a manufactured main street, and this site is under a mile from it. The city is on the main north-south highway and state road pair that run up the spine of the peninsula, with the interstate to the north, which is what puts both metro areas within range. That corridor is also the source of the growth: this is one of the faster-growing parts of the state, and large new subdivisions are going up along the highway. We have deliberately not printed any drive times, because we did not measure them and a published figure on a corridor this busy would date quickly. The honest tradeoffs are straightforward. You are a long way from a coast. Summers are hot and the afternoon storms are real. Traffic on the main corridor has grown faster than the road network. In exchange you are buying in at an inland price point in a town with an actual centre, on a site next to a park rather than behind a highway sound wall.
What does new construction cost to insure here?
Less than an older house in the same town, and for structural reasons rather than as a discount. Florida requires insurers to credit verified wind-mitigation features, and a house built to the current code earns most of them automatically: the roof covering and deck attachment, the roof-to-wall connections, the roof shape and the opening protection. A new house, inland, on a site whose parcel centres map outside the flood hazard area, is close to the best risk profile this market offers, and roof age is the single biggest underwriting question in Florida, so a brand-new roof matters more than almost anything else. On the wider market, the state-backed insurer filed a statewide average multiperil rate decrease of nearly nine per cent in the spring of 2026 and several private carriers filed decreases in the same window, so the recent direction has been downward after several genuinely hard years. We gathered no premium figures for this site and will publish none. Get real quotes on the actual specification once it exists, and ask for the mitigation credit breakdown in writing.
Why would I join a list for something this early?
Because the things you most want to know here are exactly the things that get decided in the next few months, and they get decided before anything is advertised. The plat will record, and with it the lot dimensions and the street names. A builder will be named. Lot sizes, floor plans and a price will follow. On a thirty-one-lot community at two homes to the acre beside a park, the better lots are a meaningful share of the total, and the whole community could be absorbed by a single builder release. Joining a list at this stage costs nothing, puts no deposit at risk and creates no obligation. What it does is put you in front of a Florida agent who represents you rather than the seller, before you ever register yourself at a builder's desk, which is the one thing that is genuinely hard to undo afterwards.
Be first in line
Get on the Lake Eva Estates interest list
We will connect you with a real estate professional licensed in Florida who represents you rather than the seller, who can arrange your representation before you put your name on any builder's list, and who will chase the answers this page could not: who the builder actually is, when the plat records and what the lot dimensions and street names turn out to be, whether any lot has a view over the park or the lake, the association and its dues, a written answer on whether any district applies, the school assignment once addresses exist, and the floor plans and pricing the moment any of it exists.
Nothing is for sale here today and no prices have been published. Get notified when the plat records and a builder is named, because on a thirty-one-lot community the whole thing can be absorbed in a single release.
It costs nothing, creates no brokerage relationship by itself, and does not obligate you to anything.