Approved and pre-construction near Belleview, FL
Sandy Clay
442 approved homes on about 120 acres, and a name that almost certainly will not survive to the sign
The Marion County commission approved this community's rezoning in June 2025 and its final master plan in July 2026, both unanimously. 442 single-family homes across three phases. No builder has been assigned, nothing is for sale, and the name on the paperwork is the landowning company's rather than a marketing name.
- Area
- Belleview, FL
- Homes
- 442 approved
- Site
- About 120 ac
- Approved
- Jul 2026
At a glance
Sandy Clay fast facts: master plan approved July 2026
Here is what is on the public record today and what has not been released. Anything marked not yet released, join the interest list and it goes out the day it drops.
- Area
- Near Belleview, FL
- County
- Unincorporated Marion County
- Site
- About 120 acres
- Approved plan
- 442 single-family detached homes
- Lot mix
- 239 at 40 ft wide, 203 at 50 ft
- Zoning
- Planned Unit Development
- Master plan approved
- July 2026, unanimous
- Phasing
- Three phases, 130 then 190 then 122
- Open space
- About 24.5 acres
- Amenity deadline
- Open by the 150th home completed
- Home builder
- None named yetGet notified
- Community name at launch
- Likely to changeGet notified
- Pricing
- Not yet releasedGet notified
- Model home opening
- Not yet announcedGet notified
Details on this page are compiled from public entitlement records and are targets, not commitments. Pricing, floor plans, home counts, and timing have not been released by the builder and are subject to change without notice.
Where it is
At SE 92nd Loop and SE 110th Street Road, unincorporated Marion County, south of Ocala and adjoining Belleview. Water and sewer from the City of Belleview. No street addresses yet.
Fully approved. No builder. No name.
That gap is the whole reason this page exists. 442 homes cleared both board votes unanimously and there is no builder, no price and, realistically, not even a final name yet. Add your name, email and phone and you will hear when any of that changes, and be registered as represented before your first visit.
The part nobody says out loud
This community is named after a soil type, and that will not last
Sandy clay is a soil texture classification. It sits on the standard soil triangle between sandy clay loam and clay. Search the phrase and you will get agronomy, geotechnical engineering and gardening advice, which is a strange way to shop for a house.
The reason this community carries that name is simple: it is the name of the limited liability company that owns the land. County records are indexed by the applicant, and the applicant here is Sandy Clay LLC. The county's own files already contain a second version, Sandy Clay Residential, which is what appears in the title block of the approved engineering drawings and in the development review case names.
We are telling you this for a practical reason rather than as trivia. There is no builder yet, and the marketing name on a community like this is almost always chosen by the builder, not by the landowner. So the probability that 442 homes eventually go on sale under the words Sandy Clay is low. When it is renamed, everything written about it today becomes hard to find at exactly the moment it becomes useful.
How we handle that: we track this property by its approval, its parcels and its location as well as by both versions of its current name. If it launches as something else entirely, the people on this list still get told. That is most of the value of being on it.
About the plan
What was actually approved
Sandy Clay is a Planned Unit Development on about 120 acres. The approval is capped at 442 single-family detached dwelling units, and the detached wording matters: the predecessor approval on this land allowed 452 units including townhomes, and the current one does not. If you find older material describing townhomes here, it describes a plan that no longer exists.
The lot mix is 239 lots at 40 feet wide by 120 deep and 203 at 50 by 120, delivered in three phases of 130, 190 and 122 homes. Density is about 3.7 units per acre. Roughly 24.5 acres is open space and about 27 acres is stormwater retention, with proposed impervious coverage at just under 40 percent of the site.
The conditions attached to the approval are more specific than usual and worth reading as a description of the finished streetscape. Front setbacks must be staggered with two to five foot variations. The rear fascia of homes must contrast in color and texture. One ornamental or shade tree per lot. Type C buffers on all four sides. Amenities, including a clubhouse, pool, playground, dog parks, pickleball and a gazebo, must be complete and operational by the 150th certificate of occupancy.
Two figures we will not pretend to resolve: the resolution says 119.75 acres and the surveyed master plan says 119.69. That is a six-hundredths-of-an-acre difference between an entitlement document and a survey, so we say about 120 acres and move on. We also decline to publish the master plan's minimum-area column, because the header is ambiguous and the numbers are too small to be lot areas.
One thing to be careful about
Approved is not the same as concurrency-approved
The zoning is done and the master plan is approved. But the approved master plan itself carries a note we think you should see, because it is the sort of thing that never makes it into marketing.
It states that the project has not been granted concurrency approval, that final approval to develop the property has not been obtained, and that the completion of concurrency review has been deferred to later development review stages.
Concurrency is the test of whether roads, schools, water and sewer can actually absorb a project. Deferring it to a later stage is entirely standard practice in this county and is not a red flag by itself. But it does mean that a community described as approved still has a test in front of it, and the numbers in this file suggest the test will be a real one: the traffic study projects SE 92nd Place Road operating at Level of Service F at buildout, the bottom of the scale, and Emerald Shores Elementary was reported at 101 percent of capacity.
The county's own staff report counted seven nearby developments totalling roughly 3,353 units. That is the context this project sits in, and it is a fairer way to think about traffic and schools than looking at 442 homes in isolation.
Location and costs
County land, city water
The site is at SE 92nd Loop and SE 110th Street Road, in unincorporated Marion County south of Ocala and adjoining Belleview. Three separate sources describe it as the northeast corner, the southeast corner, and simply the intersection, so we decline to pick one.
It is unincorporated county land, but the utilities are the city's. Water and sewer come from the City of Belleview. So a buyer here gets county services and county millage with no city millage component, while connecting to a city utility system. That combination is common in this part of Florida and is worth confirming yourself at contract rather than assuming either way.
The site sits within the primary and secondary Silver Springs Springs Protection Zone, the overlay protecting the aquifer that feeds Silver Springs, which imposes stricter wastewater and stormwater standards than apply elsewhere in the county. It is inside the Urban Growth Boundary and in Flood Zone X, an area of reduced flood hazard.
Sandy Clay has no price, because it has no builder. On recurring costs, there is one piece of unusually good news: no community development district exists for this project, and the approval instead requires a property owners association or the developer to maintain the common areas. That means the likely recurring cost here is HOA dues rather than a CDD assessment on your tax bill, which is not true of every community in this market. No HOA figure has been published.
We do not publish drive times to Ocala, The Villages, Gainesville or Orlando, because Sandy Clay has no assigned address or coordinates yet and any mileage would be invented precision.
What you need to know
Buying new construction, the smart way
Whoever ends up building the homes at Sandy Clay, the same rule applies: the person at the model's sales desk works for the builder, not for you. They are usually helpful and usually honest, and they still represent the seller's side of the transaction. You are allowed, and smart, to have your own representation, and in almost every case it costs you nothing, because the builder budgets a cooperating commission into the deal whether you bring an agent or not.
The catch is timing. Most builders require your agent to register you on your first visit. Tour or sign in alone and bring an agent later, and the builder can refuse to recognize them, and you lose your representation for that community. Get connected before you tour, have your agent register you, and let them read the contract and the addenda.
On a 442-home community built in three phases, the first release in each phase usually carries the best homesites and the most pricing flexibility. With two lot widths approved here, the wider 50-foot lots are the more limited inventory.
Subdiview is not affiliated with, endorsed by, or sponsored by any homebuilder, the developer, the City of Belleview, or Marion County. No homebuilder has been named for this community; the developer and engineer are identified here because they are the parties of record in the county's published entitlement documents, which is a statement of fact about the public record and not a representation of any relationship. Community names and marks are the property of their respective owners and are used for identification only. Subdiview is operated by a real estate broker licensed in Illinois. We are not your agent, we do not represent you, and we perform no real estate brokerage services in this state. No one at Subdiview is licensed in this state. If you join an interest list, your information is referred to a real estate professional licensed in the state where the property is located, who will contact you directly. We are compensated by that professional's brokerage, not by you. All community details on this page are compiled from public records, are targets rather than commitments, and are subject to change without notice.
Questions and answers
Sandy Clay FAQ
What is Sandy Clay?
Sandy Clay is an approved 442-home community on about 120 acres of unincorporated Marion County, near Belleview. All 442 are single-family detached houses, built in three phases. The county commission approved the rezoning in June 2025 and gave final approval to the master plan in July 2026, both unanimously. Nothing is built, no builder has been assigned, and nothing is for sale.
Is that name real? It sounds like a soil type.
It is a soil type, and that is exactly the problem with it. Sandy clay is a standard soil texture classification, so searching the name mostly returns soil science and gardening results. It is also almost certainly not the name this community will be sold under. Sandy Clay is the name of the limited liability company that owns the land, and the county's own records already carry a second version, Sandy Clay Residential. A production builder taking this over will very likely rebrand it. We track the property by its approval and its location as well as its name, so a rename does not lose you.
Is the approval final?
Yes, and it took two separate board actions to get there. The county commission approved the rezoning to a Planned Unit Development in June 2025, on the condition that a final master plan come back to the Board for approval. That final master plan was approved in July 2026. The county's own development review record states plainly that the item was approved by the Board of County Commissioners on that date. There is no further discretionary approval outstanding.
I read this was approved on a split vote. Was it?
No, and this is worth correcting because two local outlets got it wrong. Both reported the June 2025 vote as four to one with one commissioner dissenting. The county's own minutes record the vote as five to nothing, on both the land use amendment and the rezoning. When published minutes and press coverage disagree, the minutes are the record. The final master plan vote in July 2026 was also unanimous.
Does that mean it is ready to build?
Not quite, and we would rather be precise than let you assume. The approved master plan itself carries a note stating that the project has not been granted concurrency approval, that final approval to develop the property has not been obtained, and that concurrency review has been deferred to later development review stages. Concurrency is the test of whether roads, schools, water and sewer can actually absorb the project. Deferring it is standard practice in this county, but it means the last word has not been said. A preliminary plat and an improvement plan are in county review.
What will the homes be like?
The lot mix is the most concrete thing on the record: 239 lots at 40 feet wide by 120 deep, and 203 lots at 50 by 120. That is a production-housing pattern with two product widths, and it is a fairly typical modern Florida configuration. Overall density is about 3.7 homes per acre. Roughly 24.5 acres of the site is open space and about 27 acres is stormwater retention. Beyond lot geometry, nothing: no floor plans, no square footages, no elevations and no pricing exist, because no builder has been assigned.
When do the amenities open?
The county attached a hard trigger, which is genuinely useful. The amenities must be completed and operational by the 150th certificate of occupancy, meaning by the time the 150th home is finished. The approved amenity list includes a clubhouse, pool, playground, dog parks, pickleball and a gazebo. Buyers in new communities routinely spend years next to a fenced-off future pool, so a condition tying the amenity to a home count rather than to the developer's convenience is a real protection, and it is in the approval rather than a brochure.
What else did the county require?
Several conditions that will shape how the place actually looks. Front setbacks must be staggered with two to five foot variations, so the street does not read as a single flat wall of identical facades. The rear fascia of homes must contrast in color and texture, which matters because rear elevations are what your neighbors see. One ornamental or shade tree per lot. Type C landscape buffers on all four sides. Two turn lanes at the developer's expense: an eastbound left onto the primary entrance and a northbound right at the secondary. All internal roads are private.
Where exactly is it?
At SE 92nd Loop and SE 110th Street Road, in unincorporated Marion County south of Ocala and adjoining Belleview. We are deliberately not telling you which corner, because three separate sources describe it as the northeast corner, the southeast corner, and simply the intersection. Rather than pick one, we will say it sits at that intersection and leave the precision to the plat. There are no street addresses or platted lots yet.
Is it in the City of Belleview?
No. It is unincorporated Marion County. That matters to your tax bill, because unincorporated property pays no city millage. It does not mean the city is uninvolved, though: water and sewer for this community come from the City of Belleview. So you would have city utilities and county services, which is a common arrangement here and a frequent source of confusion.
What about traffic and schools?
Both are real and both are in the record. The traffic study puts the community at roughly 3,960 daily vehicle trips, and projects that SE 92nd Place Road will operate at Level of Service F at buildout, which is the bottom of the scale. On schools, Emerald Shores Elementary was reported at 101 percent of capacity. The county's own staff report noted seven nearby developments totalling roughly 3,353 units, so the cumulative picture matters more than this project alone. Attendance zones are assigned by physical address, which does not exist here yet.
Any environmental constraints?
One that is worth understanding. The master plan states the project sits within the primary and secondary Silver Springs Springs Protection Zone. That is the regulatory overlay protecting the aquifer feeding Silver Springs, and it imposes stricter standards on wastewater and stormwater than apply elsewhere in the county. The site is inside the Urban Growth Boundary, which is the opposite of several other communities we track, and it is in Flood Zone X, an area of reduced flood hazard.
Was there opposition?
Very little. Among all the notified property owners, only two filed objections. The concerns raised were traffic, buffering, safety, dust and air quality from nearby sand mining, and cumulative impact from the other approvals in the area. Both board votes were unanimous.
How do I get updates on Sandy Clay?
Join the interest list on this page. We read Marion County's commission records directly, which is how the correct vote count, the concurrency caveat and the amenity deadline ended up here rather than in a press summary.
Be first in line
Get on the Sandy Clay interest list
442 homes approved unanimously, no builder, no price, and a name that will probably change before anything is sold. That last part is exactly why a list is worth being on: when this community is renamed and launched, most people will not connect it to anything they have read.
Joining costs nothing, creates no brokerage relationship, and does not obligate you to anything. When you are ready, a real estate professional licensed in Florida will reach out and can register you as represented before your first visit to a sales office.