Be first in line
New construction coming to Chisholm Trails, between Hutto and Georgetown
Chisholm Trails is a new single-family community taking shape on the farmland between CR 105 and CR 107, just west of the SH 130 toll corridor, with a Hutto mailing address and about five miles of open country between it and the Georgetown courthouse square. The approved plan is about 800 homes on about 220 acres in four phases. The first phase is being graded right now, and the two national builders who own the land together have published no price, floor plan, square footage, sales office or opening date. This page collects what the public record says, including the tax arithmetic and the jurisdiction question.
- Area
- Hutto, Williamson County
- Builders on title
- Taylor Morrison and M/I Homes
- Approved plan
- About 800 lots on about 220 acres
- Status
- Earthwork under way, no homes started
- Area
- Hutto, Williamson County
- Builder
- Taylor Morrison
What is released, and what is not
Most pages about an unbuilt community blur the line between what has been filed and what has been decided. Those are different things, so they are separated here. The first group sits in a public record we read. The second has not been released, and no amount of searching will produce it until it is published.
- Where
- Unincorporated Williamson County, inside the City of Georgetown extraterritorial jurisdiction, with a Hutto 78634 mailing address
- Builders on title together
- Taylor Morrison and M/I Homes, jointly on record for the land, neither selling homes here yet
- Approved plan
- About 800 single-family lots on about 220 platted acres, in four phases
- First phase
- Roughly 200 lots
- Open space
- About 51 acres in drainage, landscape and amenity lots, including a creek corridor
- Where the work stands
- Earthwork under way on the first phase, no homes started, no final plat recorded, no addresses assigned
- School district
- Georgetown Independent School District, not Hutto
- Water
- Jonah Water Special Utility District, a rural water supply corporation
- Wastewater and interior streets
- Williamson County Municipal Utility District No. 60, which will treat sewage on a platted plant lot inside the community
- Combined 2026 property tax rate
- 2.573347 dollars per 100 dollars of value, with no city rate because there is no city, as of 2026-11-20
- Flood mapping
- Mapped outside the special flood hazard area on a precise polygon check, as of 2026-11-20
- Prices
- Not released
- Floor plans, elevations and square footage
- Not released
- Sales office location
- Not announced
- Model home
- None open; the first is targeted for late spring 2027, which is a target and subject to change
- Opening date for sales
- Not announced
- Association dues and documents
- Not published
- Amenity delivery date
- Not announced
Details on this page are compiled from public entitlement records and are targets, not commitments. Pricing, floor plans, home counts, and timing have not been released by the builder and are subject to change without notice.
Subdiview is not affiliated with, endorsed by, or sponsored by Taylor Morrison or M/I Homes. Taylor Morrison, M/I Homes and their community names are trademarks of their respective owners and are used here for identification only. All community information is compiled from public records and is subject to change.
Get on the Chisholm Trails interest list
We watch the county records and the imagery rather than waiting for a press release. Get notified when a price, a plan or an opening date is published.
The address says Hutto. Almost nothing else does.
This is the most important thing on the page and the fact most likely to be reported wrong elsewhere. The mail comes to Hutto 78634, because that is the postal route reaching this country. The land itself is in unincorporated Williamson County, inside the City of Georgetown extraterritorial jurisdiction, the ring of land a Texas city regulates for subdivision purposes without having annexed it. It is not in the Hutto city limits and not in Hutto Independent School District.
What the split changes. Schools are Georgetown Independent School District, with different campuses, boundaries and tax rate. There is no city property tax line, which sounds like a win and is complicated by the next section. Fire and emergency medical response come from the Georgetown fire service through a Williamson County emergency services district, itself a taxing unit on your bill. Policing is the county sheriff, and response distances out here are longer than inside a city.
Permitting surprises people most. Williamson County does not issue building permits on unincorporated land, and the city whose extraterritorial jurisdiction this sits in does not inspect houses out here either. So the inspection regime on a home in Chisholm Trails is the builder's own quality programme plus state requirements plus whatever the utility district imposes, not a municipal building department signing off stage by stage. A third-party inspection you pay for yourself therefore carries more weight here.
One more consequence before you fall in love with the no-city-tax line: land inside a city's extraterritorial jurisdiction can be annexed later, which would add a city rate to a bill that already carries a utility district. It also tells you who to call: plat questions to the county and Georgetown's development staff, schools to Georgetown Independent School District, water and sewer to the utility district and the water supply corporation. Hutto city hall, despite your envelope, is the authority for none of it.
Taxes, the utility district, and the number that changes the payment
Texas has no state income tax and pays for local government with property tax instead, so the rate on a new house is the largest single variable in what it costs to own. For Chisholm Trails it is knowable today, and higher than a casual search will tell you.
The combined 2026 adopted rate over this land is 2.573347 dollars per 100 dollars of value: county general 0.381218, county road 0.040329, Georgetown Independent School District 1.110600, the Williamson County emergency services district 0.091200, and Williamson County Municipal Utility District No. 60 at 0.950000. There is no city rate, because there is no city. Adopted rates for tax year 2026, as of 2026-11-20. No public improvement district and no municipal management district applies here; both were checked.
The district line is the one to stare at. At 0.95 it is the second largest item on the bill after the school district, and larger than the county and the emergency services district combined. Strip it out and the all-in rate here would be around 1.62; leave it in and you are at about 2.57. On a four hundred thousand dollar home that is roughly three thousand eight hundred dollars a year of district tax alone, about three hundred and seventeen dollars a month. Homestead exemptions soften the school share, not the district share.
This is why a median effective rate for a nearby city will badly mislead you here. A municipality-wide median blends older homes at low assessed values, long-standing exemptions and whole neighbourhoods with no utility district. A new house inside a new district is the most expensive case in that blend, not the average of it.
None of this makes a district bad. Districts like No. 60 are how water plants, sewer plants, drainage and streets get built where no city utility reaches, with the cost spread across decades of tax bills rather than loaded into the lot price. Such rates typically decline as the tax base grows and bonds amortise, but there is no guarantee and no published step-down schedule here. When pricing appears, have the lender quote the payment at the full combined rate, not a county average.
Association dues are a smaller unpublished number. There will certainly be an assessment, because an association will own the open space, landscape and amenity lots. No dues figure, budget or covenants have been published, and we will not estimate one.
The community will treat its own sewage, and that is worth understanding
Here is the detail that makes Chisholm Trails genuinely unusual, sitting in plain sight on the approved plat. The plan dedicates a lot of about four acres inside the subdivision boundary for a wastewater treatment plant, owned and operated by the utility district, plus a two-acre lot for water utility use. Retail drinking water comes from Jonah Water Special Utility District, a rural water supply corporation serving much of eastern Williamson County, so that is a membership and meter arrangement, not a city account.
What is an on-site plant in practice? A small municipal-scale facility that collects the neighbourhood's wastewater, treats it to permitted standards and disposes of or reuses the effluent, usually by irrigating open space. A developer builds one when no city sewer main is within reach, and it is ordinary at this distance from a Texas city.
It has consequences to price in. A plant has a footprint and a buffer, so homesites nearest that four-acre lot are not identical to those at the far end, whatever a site map implies. Plants can have odour events, usually tied to weather or a process upset. The district owns the plant, so its operating and expansion costs are part of what the tax rate funds, and because the district maintains every street here, street repair is a district question.
So the questions, once there is anyone to ask, are concrete. Where is the plant lot relative to the homesite you like, and which way does the prevailing wind blow. What is the permitted capacity against an eventual 800 homes. What do the district's latest rate order and budget say. Its filings answer those; a sales consultant on day one will not.
Two builders, one neighbourhood, three series names
Taylor Morrison and M/I Homes hold this land jointly on record under a single 2025 instrument, and both will sell homes on the same streets inside one community. Neither is selling here yet.
Taylor Morrison divides its half into three series named for lot width, marketed as the 40s, the 45s and the 50s, and publishes each as its own listing. They are not three neighbourhoods; they are three product tiers inside Chisholm Trails, on one set of streets, under one association and one utility district. M/I Homes organises its homes into three collections. So if you searched Chisholm 40s, Chisholm 45s, Chisholm 50s, Taylor Morrison Chisholm Trails or M/I Homes Chisholm Trails, you are in the right place: every one of those names refers to this same community.
What that means for you, honestly. Different price points and plan sets on adjacent streets, which is a feature if you want choice and a complication if you want a uniform streetscape. Two sales operations, two contracts, two warranty programmes and two incentive structures, which will not match lot for lot. Quote both, and expect the release windows not to coincide. Competition on the same streets tends to produce better incentives, and mixed-brand resale comparables widen the buyer pool.
There is a risk point in your favour too. Both builders are on title, both have real capital in the dirt, a utility district exists and has adopted a rate, so the bond financing behind the infrastructure is in place, and the first phase is being graded.
Where the work actually stands on the ground
The clock on Chisholm Trails can be read without waiting for a press release. The county commissioners approved the preliminary plat in the summer of 2025, and a utility district was created over the land weeks later with a boundary matching the project boundary. Satellite imagery shows intact pasture and row crop, furrows and fence lines plainly visible, across three straight autumns.
Then, on two independent dates in the autumn of 2026, roughly sixty-nine acres of the north-west tract appear stripped to bare caliche across essentially the whole parcel, with linear graded features that read as road prisms and utility trenches, a hard-edged pad at one end and a dark water-filled basin at the other. The disturbed area stops exactly on the parcel line along its full diagonal length, which is not something weather does. The large south-east tract is still untouched farmland, consistent with a first phase only.
So the honest status is that earthwork has started on the first phase and no homes have started. A final plat has not recorded and no addresses have been assigned, which matters: until a final plat records there are no individually conveyable lots, so neither builder can sell you a specific homesite today. The realistic order is that a final plat records, the appraisal district creates the first-phase lot parcels, the county assigns addresses, the builders release a site map and then plans and prices, and models open. The first model home is targeted for late spring 2027, a target subject to change.
Where this is, what the drive is like, and what the tolls cost
Set the mailing address aside and place Chisholm Trails on a map. The Georgetown courthouse square is about five miles north-west and Hutto city hall about five miles south-east. Downtown Round Rock and the large technology campus there are roughly eight miles south-west. The semiconductor campus at Taylor is about ten miles east, downtown Taylor a couple beyond. Downtown Austin is about twenty-five miles south-south-west and the airport twenty-eight.
Now the honest driving version. The SH 130 toll road runs along the eastern edge of the site and carries most of these trips. Georgetown and Hutto are both ten to fifteen minutes on local roads, Round Rock fifteen to twenty, and Taylor and the semiconductor campus roughly twenty via the toll road and US 79. The airport is around thirty-five minutes off peak. Downtown Austin is the weak point at forty to fifty-five minutes depending on the hour. Every one of those numbers is materially worse at peak.
The toll corridor makes the location work and it is not free. A daily round trip on SH 130 costs a few dollars each way depending on how far you ride it and whether you carry a transponder, which over a year belongs in the same spreadsheet as the mortgage and the district tax. The alternative is Interstate 35, free and often much slower.
What the immediate surroundings genuinely are today: farmland. Row crop and pasture on three sides, scattered one- and two-acre homesteads along the county roads, a large-lot acreage subdivision north-east across a drainage, a wooded creek corridor through the holding, and the toll lanes with a small highway commercial cluster at the south-east corner. No retail, no school and no park within walking distance. Both readings of that are fair. For it: quiet, dark skies, long views and a new house at a price a comparable location inside Georgetown or Round Rock no longer supports. Against it: dust, haul trucks and a changing skyline for years, conveniences five miles away, and farmland next door with no municipal zoning protecting it from whatever it becomes.
For errands and weekends Georgetown is the realistic hub at about five miles: the historic courthouse square, the San Gabriel River parks and trail system, Lake Georgetown, Blue Hole, and full-line grocery and big-box retail along Interstate 35 and Williams Drive. Hutto covers closer everyday needs, grocery and pharmacy among them. Inner Space Cavern at Georgetown is a local oddity and a reliable rainy Saturday. The county's wider Brushy Creek corridor and regional trail sit south and west toward Round Rock, a county amenity rather than a neighbourhood feature; the creek here is not part of that trail.
Schools, insurance and the rest of the decision
Schools first. Chisholm Trails is in Georgetown Independent School District, established three ways: the county's address-to-jurisdiction service returns Georgetown ISD for every address point on and beside the tract, one builder states it on its community page, and the other files the community under Georgetown. Hutto Independent School District does not serve this land. School attendance in Texas follows the district boundary, not the postal city.
Campus assignments are a different question, and they are not established. The county lookup returns no assignment for elementary, middle or high at these points, because no addresses exist yet; the district has been running a boundary adjustment ahead of new campus openings; and one builder states plainly that campus assignments are confirmed upon final platting and address assignment. So no campus is named here. Confirm it with the district in writing against your actual address at contract.
On flooding the answer here is cleaner than most: on a precise polygon check of the production tracts against current federal flood mapping, the land is mapped outside the special flood hazard area, as of 2026-11-20. Be honest about the surroundings, though, because mapped flood hazard does exist on neighbouring land nearby along the creek. Flood maps are revised, and mapped outside is not the same as unable to flood. Get your lot's mapping on the map in force the day you close, ask whether your lot carries a drainage easement you will maintain, and price a preferred-risk policy anyway.
Weather here means hail, not hurricanes. Williamson County sits at the southern end of the American hail corridor, and Austin-metro premiums have risen on hail and wind losses rather than fire or flood. Carriers here commonly apply a separate percentage deductible for wind and hail, often one or two percent of the dwelling amount rather than a flat figure, so on a four hundred thousand dollar dwelling a two percent deductible is eight thousand dollars from your pocket before the policy pays for a roof. Settlement basis matters more than premium: actual cash value schedules are common on older roofs, and a new build starts with full replacement cost. Shop before you are under contract.
Inside the community the plan includes a central amenity lot of about three acres, described by one builder as carrying a resort-style pool and a community pavilion, plus green space within the fifty-one acres of open space, landscape and drainage lots. No delivery date has been announced, and whether it lands in the first phase is not established.
Why this stage matters, and how to buy without giving up leverage
There is a narrow window in a new subdivision's life when the plat is approved, the district is created, the dirt has moved and the marketing has not started. Chisholm Trails is in it, and it is closing: a district rate is already adopted, so the infrastructure financing is in place, and a first model is targeted for 2027.
Why does that matter in dollars? Platting eight hundred lots, standing up a utility district, grading sixty-nine acres and building a water and wastewater system is a commitment made a year or more ahead of revenue. By the time a price list prints, that money is spent, and the business needs absorption more than a headline number. The earliest releases are therefore where incentives tend to be most available: closing cost credits, rate buydowns through a builder's own mortgage arm, design centre allowances. None of that is published, which is exactly why it is negotiable.
The early window also buys selection, and here the lots are not equal. Some will back the wastewater plant lot. Some will back the drainage lots and the creek, usually the premium position. Some will sit nearest the toll corridor, where night traffic noise is real. On a plat you can see which is which before anybody has chosen. The other side deserves equal weight: buying first means years of construction traffic, an amenity that may arrive after you do, and no comparable sales to anchor an appraisal. If you expect to move again within three or four years, a finished neighbourhood five miles away is likely the better buy.
Which brings up the most expensive misunderstanding in new construction: who the friendly person at the sales desk works for. They work for the builder, and the contract they hand you is that company's document. You can be represented by your own agent instead, and it costs you nothing, because the builder budgets a co-operating commission either way. That person reads the contract before you sign, presses on what builders actually negotiate, usually incentives, allowances and closing costs rather than the headline price, and insists on the district rate and association documents in writing.
The catch is timing and it is strict. Most builders require your agent to be registered as representing you at your very first visit; walk in alone and the builder will generally decline to recognise an agent you bring later. At Chisholm Trails that applies twice over, because registering with one sales operation does nothing for the other, so get on both lists. Right now that is easy, because there is nothing to walk into and no sales trailer anywhere near Strait Drive. That is what this interest list does: your information goes to a real estate professional licensed in Texas who contacts you directly.
Common questions about Chisholm Trails
Is Chisholm Trails selling homes yet?
No. As of November 2026 there is no published price, no floor plan, no square-footage range, no model home, no sales office location and no listing for Chisholm Trails. The preliminary plat is approved, a utility district has been created over the land and adopted a tax rate, and earthwork is under way on the first phase. Nothing has been released for sale, and with no final plat recorded there are not yet individually conveyable lots for anyone to sell. That is what this page is for: to put you on the list ahead of the first release.
Who is building Chisholm Trails?
Two builders. Taylor Morrison and M/I Homes hold the land jointly on record under a single 2025 instrument, and both will sell homes on the same streets under one community name. Neither is selling here yet. Taylor Morrison markets its side as three series named for lot width, the 40s, the 45s and the 50s, and M/I markets three collections of its own. Subdiview is not affiliated with either builder.
Is Chisholm Trails actually in Hutto?
Only the mailbox is. The land is in unincorporated Williamson County, inside the City of Georgetown extraterritorial jurisdiction, and the mailing address is Hutto 78634 because that is the ZIP code that reaches it. It is not inside the Hutto city limits and it is not in Hutto Independent School District. Schools are Georgetown ISD, fire and emergency medical service come from Georgetown through a county emergency services district, and law enforcement is the county sheriff.
What will property taxes be at Chisholm Trails?
The combined 2026 adopted rate over this land is 2.573347 dollars per 100 dollars of value: county general 0.381218, county road 0.040329, Georgetown ISD 1.110600, the county emergency services district 0.091200 and Williamson County Municipal Utility District No. 60 at 0.950000. There is no city rate, because there is no city. As of 2026-11-20. Note how large that district line is; it is the second biggest item on the bill after the school district.
What is the municipal utility district, and why does it matter so much here?
A Texas municipal utility district is a local government created to finance and operate water, wastewater, drainage and sometimes streets where no city utility reaches, and it repays its bonds with a property tax on the homes inside it. District No. 60 was created over this land in summer 2025 and its boundary matches the project boundary. It has already adopted a 2026 rate of 0.95 dollars per 100 dollars of value. Without it the all-in rate here would be roughly 1.62 rather than about 2.57, so this is a real difference in the monthly payment rather than a technicality.
Which schools will serve Chisholm Trails?
Georgetown Independent School District at the district level, confirmed by the county address-to-jurisdiction service over the land and by the builders' own filings. Campus assignments cannot be stated. The county lookup returns no assignment for elementary, middle or high at these points, the district has been running a boundary adjustment ahead of new campus openings, and one builder states that campus assignments are confirmed at final platting and address assignment. Confirm the zoned campus with the district against your actual street address at contract.
Will the neighbourhood really treat its own sewage?
Yes. The approved plat dedicates a lot of about four acres inside the subdivision for a wastewater treatment plant, owned and operated by the utility district, and a separate two-acre lot for water utility use. Retail drinking water comes from Jonah Water Special Utility District, a rural water supply corporation rather than a city utility. Operating that plant is part of what the district tax rate pays for, alongside bond debt service.
Is Chisholm Trails in a flood zone?
On a precise polygon check of the production tracts against the current federal flood mapping, the land is mapped outside the special flood hazard area, as of 2026-11-20. Mapped flood hazard does exist on neighbouring land nearby along the creek, so the surrounding area is mixed even though this tract is not. Flood maps are revised, and being mapped outside that area is not the same as being unable to flood, so get your specific lot's mapping in writing.
What are the streets called?
Eighteen names appear on the approved plat's street table: Bentley Place, Chesney Lane, Childers Road, Combs Way, Currington Avenue, Ernest Way, Faithful Terrace, Fleetwood, Gosset Cove, Myers Lane, Odessa Lane, Rare Bend, Revival Street, Ribbon Street, Saints Cove, Southall Drive, Strait Drive and Wallen Street. Several more names are on the plan but could not be read cleanly enough to publish a spelling. Every street is shown with a fifty-foot right of way, thirty feet of pavement and a twenty-five mile per hour design speed, maintained by the utility district rather than the county.
How big will Chisholm Trails be when it is finished?
The approved plan is about 800 single-family lots on about 220 acres in four phases, with roughly 200 lots in the first phase. Alongside the house lots the plan sets aside about 51 acres in drainage, landscape and amenity lots, which is close to a quarter of the site, plus separate lots for the water and wastewater facilities. Those are the platted figures and they can change between preliminary approval and recording.
Should I bring my own agent to a new-construction community?
Yes, and the timing matters more than most buyers realise. The agent at a builder's sales desk works for the builder. You can be represented by your own agent instead, at no cost to you on new construction, but you usually have to register as represented at your very first visit or the builder will not recognise your agent afterwards. With two separate sales operations here, that registration has to happen with both.
How do I get updates on Chisholm Trails?
Join the interest list on this page. You will get an email when a price, a plan, an opening date or a recorded final plat actually exists, and an agent licensed in Texas can walk the site and the contract with you when you are ready.
Get on the Chisholm Trails interest list
No price, no plan, no sales office and no opening date have been published for Chisholm Trails. When they are, this list hears first.
Subdiview is operated by a real estate broker licensed in Illinois. We are not your agent, we do not represent you, and we perform no real estate brokerage services in this state. No one at Subdiview is licensed in this state. If you join an interest list, your information is referred to a real estate professional licensed in the state where the property is located, who will contact you directly. We are compensated by that professional's brokerage, not by you.