The Grove, Fort Pierce
There is a new single-family community approved on the north side of Indrio Road, a couple of minutes east of the Interstate 95 interchange in northern St. Lucie County. The site work permits are issued, the governing site plan was refreshed in autumn 2026, and a model center has been permitted and given a street address. What does not exist yet is the part buyers normally search for: no prices, no floor plans, no square footages, no street names, and no sales center. This page is an honest account of what the public record actually shows today, and a way to be told the moment that changes.
What is actually approved
It is worth separating the things that are settled from the things that are still moving, because at this stage of a community most of what circulates online is neither. The land was rezoned in spring 2024 from agricultural use into a mixed-use district, covering roughly a hundred and seventy-eight acres. A major site plan for the northwest neighborhood was approved later that year and then adjusted again, most recently in October 2026, with that approval carrying just over three hundred single-family homes. A separate final site plan governs the east neighborhood, where roughly a hundred and fifty single-family homes sit alongside a multifamily component of about a hundred and fifty units. Those unit counts have shifted with every revision, which is normal, and they will not be fixed until the plats record.
On the engineering side, two state environmental resource permits covering the northwest site and the east site were issued in September 2025 and run to 2030. In Florida that permit is the one that has to exist before mass grading, stormwater construction or utility work can begin on a subdivision, so an issued permit with a homebuilder named on it is the clearest public signal that a project has moved from paper into dirt. One of the two is titled for a model center, which is the piece of infrastructure a builder puts in immediately before it starts selling.
The two pieces still outstanding are the ones that matter most to a buyer. Neither final plat has recorded. Both were resubmitted to the county for a second round of review in October 2026. Until a plat records there are no legal lots, no lot numbers, no street names and nothing that can be put under contract. Earlier preliminary plats for the same land were allowed to lapse in review, which is a reminder that this process is not a straight line.
Where this is, and why the address is misleading
The mail here will say Fort Pierce, in the 34951 ZIP code. The land is not in the City of Fort Pierce. It is unincorporated St. Lucie County, which was confirmed against the county municipal boundary layer, the parcel records and the ZIP boundaries, and the City of Fort Pierce development and building permit records contain nothing for this project at all. That is not a technicality. An unincorporated address means county services, county code enforcement, a county sheriff rather than a city police department, and a materially lower property tax rate than either city in this county. It also means there is no city commission to appeal to about what gets built next door.
The geography is genuinely unusual, and it is the single most useful thing to understand before visiting. This is the far northern end of St. Lucie County. Downtown Fort Pierce is around nine miles south. Downtown Vero Beach, in the next county up, is about eight miles north, which makes it marginally the closer of the two historic downtowns. The county airport is roughly five miles away. Port St. Lucie, which the community is sometimes filed under online, is eighteen miles south, and Tradition is about the same. If you have been looking at homes in Port St. Lucie and assume this is a near neighbor of those communities, it is not. Those are straight-line distances measured from the center of the site and road routes will be longer.
What you get for that position is the interchange. Interstate 95 runs along the western edge of the northwest neighborhood, which is the practical reason the land is being developed now. A commute south toward Palm Beach County is roughly sixty miles and it is almost all interstate. A commute north into Indian River County is short. For anyone whose working life runs up and down the Treasure Coast rather than into a single downtown, that is a strong location. For anyone who wants to walk to a coffee shop, it is not: this is a corridor of agricultural land, citrus groves and highway frontage that is in the early years of becoming suburban.
The thing to understand before you fall in love with a rendering
This is the part no brochure will put in front of you, and it is the reason to read the county file rather than the marketing.
The Grove is not a standalone subdivision. It is the residential fraction of a mixed-use, commerce-led district. The zoning the homes sit under was adopted expressly to put retail and workplace uses on this land, and the same master plan carries, in the county's own files, up to four hundred and twenty thousand square feet of commercial space approved in 2026; a multifamily component of roughly a hundred and fifty units that has been carried continuously since the original 2024 site plans; a brand-new pre-application for an apartment development on about thirty-six acres, filed in October 2026 and still unresolved, whose footprint is effectively the same ground as the east neighborhood's first plat area; and a small commercial subdivision at the Indrio and Koblegard corner. Across Indrio Road at the interchange, a large travel center with well over a hundred fueling positions is in final site plan review on its own forty-six acre parcel.
None of that is hidden, and none of it is necessarily bad. Plenty of buyers would rather have shops and services within a golf cart ride than drive twenty minutes for milk. The point is that the quiet residential rendering and the approved land plan are describing the same place, and only one of them mentions the commercial square footage, the apartments or the truck stop.
There is a sharper version of this. At a 2026 county planning hearing on the commercial regulating plan for this master development, the applicant asked for a set of changes: new outparcel lot types, sidewalks on one side only of most internal streets rather than both, a smaller landscape buffer along Indrio Road, and a reduced wall height along Spanish Lakes Boulevard. County staff came back with ten recommended conditions. The applicant accepted only a couple of them. The planning body recommended approval anyway, with one member dissenting. So the buffer, the wall and the sidewalk network you see drawn on a sales map are, at least in part, features the developer has already been on record asking to reduce. If a continuous sidewalk or a screened boundary is something you care about, that is a question to ask in writing, against the approved plan, before you sign anything.
Two specifics are worth carrying with you. First, the northwest neighborhood's western boundary is the interstate right-of-way line itself. Both parcel descriptions are written as excluding the highway right-of-way, and the nearest point of that site sits a little over five hundred feet from the centerline of I-95, while the east site is roughly four times further away. Somebody will own the lots closest to that edge. Ask which ones they are and what goes between them and the traffic. Second, the neighbor along the southern and eastern boundary is an established land-lease manufactured-home community. That matters in two ways: it is the boundary the developer asked to lower the wall against, and land-lease manufactured housing does not serve as an appraisal comparable for new site-built homes, which can affect how the first resales in here are valued.
Who is building it
D.R. Horton owns both of the development parcels outright, in its own corporate name, with its Florida homebuilding division listed as the mailing address, and it is also the named permittee on both site work permits. That is a stronger record than most communities at this stage can show, where the land often sits with a land banking entity and the builder's identity is a rumor. The ownership also reads as development intent rather than speculation: the agricultural tax classification on Horton's acreage has already been stripped, while the remaining balance of the master development, a little over a hundred and eleven acres, is still held by the land seller under a grazing classification. In practice that means the builder has taken down the first two phases and the rest of the land will come later.
What is not established is which brand or product series will be sold here, what the floor plans are, how big the homes will be or what they will cost. No community page for this project exists on the builder's own website. Subdiview is not affiliated with D.R. Horton, is not its agent, and nothing on this page should be read as a statement from the builder. The company is named here because the public record names it.
One honest caution on what kind of community this will be. The evidence points to homes built for individual buyers: the builder holds title in its own name, and two plats of individual lots are in review, which is what you do when you intend to sell lots one at a time. But that evidence is suggestive rather than conclusive, and the same master development contains a planned apartment component plus a new, unresolved apartment application on ground that overlaps the east neighborhood's first plat area. This builder also develops homes for rent elsewhere in the Fort Pierce area, on a different site with a different product. We think this is a for-sale community. We cannot prove it from the record as it stands today, and we would rather say so than imply a certainty we do not have.
Flood, wind and what insurance costs
This is the good news on this site, and it is checkable. Both site areas are mapped outside the special flood hazard area on the current federal flood maps, as an area of minimal flood hazard. That was tested across the full footprint of each permitted area rather than by dropping a pin in the middle, which matters because plenty of Florida sites are split, with part of the land inside the hazard area and part outside. This one is not split. Being mapped outside the special flood hazard area means a federally backed lender will not require flood insurance, though a prudent buyer carries it anyway at the much lower rate that applies, and flood maps do get revised.
Homeowners insurance is the bigger number in Florida, and northern St. Lucie County is a comparatively good place to be buying it. Average premiums in this county moved from about three thousand five hundred dollars to just under that over the first seven months of 2026, a slight decrease, according to state insurance reporting published in August 2026. On the same reporting for the same period, Martin County averaged well over five thousand and Palm Beach County over six thousand, with Indian River County in between. St. Lucie is the least expensive county to insure along this stretch of coast. Those figures are county averages across all housing stock as of mid-2026, not a quote, and a brand-new home built to current code with modern opening protection will typically underwrite better than the county average rather than worse. Get an actual quote on an actual address before you rely on any of it.
Taxes, and the assessment question nobody asks early enough
An unincorporated address in this county carries a total property tax rate of about nineteen dollars per thousand dollars of taxable value, on the most recent final millage table published by the state, which covers the 2024 tax year. The city rates on that same table are materially higher: Port St. Lucie districts run between about twenty-two and twenty-four dollars per thousand, and the City of Fort Pierce is at the top of that range. Roughly a third of the unincorporated bill is the school component. Florida's homestead exemption applies normally, and the additional exemption amount is set by state law rather than by this county.
The millage rate, though, is only half of a Florida tax bill, and the half most buyers never ask about is the non-ad-valorem side: the special district assessments that appear lower down the same bill and are not described by any tax rate. Here is the honest position. No community development district covers this land today. The county district mapping returns nothing over either site area, and no CDD appears anywhere in the approval record. That is a real answer, established from district records rather than inferred from a tax code, which is a mistake that gets made constantly.
But it is not the whole answer. This land lies inside an independent water control district, chartered by a special act of the Florida Legislature, that covers the townships and ranges containing this site. It owns two canal and road right-of-way parcels that physically cross the property. That district has the authority to levy a maintenance tax on an equal per-acre basis and to collect non-ad-valorem assessments in the same way county taxes are collected. Its charter sets a ceiling on that per-acre tax. We are deliberately not publishing a dollar figure, because the ceiling in the charter is not the same thing as the rate actually being levied this year, and we were not able to retrieve the current levying list to confirm what is in fact being charged. Separately, a community development district can still be created for this project before the first closings, as happens routinely in Florida, which would add a bond assessment that does not exist today.
So the practical instruction is simple. When pricing arrives, ask the builder for the total annual carrying cost in writing, broken into ad-valorem taxes, every non-ad-valorem assessment including any water control district charge, and the homeowners association budget. Ask whether a community development district is contemplated. A community can be cheaper on paper and more expensive to live in than the one next door, entirely on the strength of the lines below the millage.
Schools
St. Lucie County is served by a single county-wide school district, so there is no question of which district this community falls into. There is a real question about which individual schools will serve it, and that question cannot be answered honestly today. No lots and no residential addresses exist here yet, and attendance boundaries in a growth corridor get redrawn as new capacity opens. Any specific elementary, middle or high school attached to this community right now would be a guess dressed up as information. Once addresses are assigned, the district's own boundary lookup is the only source worth trusting, and it is worth rechecking before closing rather than at contract.
Buying this early: how the contract actually works
Buying into a community at this stage is a different transaction from buying a finished house, and the differences are mostly in the paperwork rather than the price. A pre-construction purchase agreement from a production builder is the builder's document, drafted for the builder, and the terms that matter are rarely the ones in large print.
The deposit is the first one. Understand exactly how much is required, at what milestones, whether any of it is refundable, and what happens to it if the plat does not record on the schedule the builder expects or the project is reconfigured again. The second is the price escalation and specification clause, which in many builder contracts allows changes to materials or allowances between signing and closing. The third is the completion window, which is typically expressed as a long outside date with generous extensions rather than a promise. The fourth is the dispute and warranty language, including whether you are agreeing to arbitration and what the structural warranty actually covers in years three through ten. The fifth is the financing and incentive structure, because the headline incentive on a new home is very often tied to using the builder's own lender, and the rate buy-down is worth comparing against an outside loan with the incentive removed.
The one piece of timing that is specific to a community this early: do not sign anything that depends on a lot until the plat has recorded and you can identify that lot by its legal description. Ask for the recorded plat, the approved site plan and the homeowners association budget and governing documents together, and read where your lot sits in relation to the commercial parcels, the apartment component and the interstate right-of-way. All of that is public record. Most buyers never look at it, and the people who do tend to end up on the better lots.
There is one genuine advantage to being early that is worth naming. In the window before a community has a sales center and a price sheet, the lot inventory is complete. Every corner, every cul-de-sac, every lot that backs onto preserve rather than pavement is still available. By the time a community is actively advertising, the best positions are usually gone. That is the whole reason to know about a place before it opens.
What we will tell you, and what we cannot
Things we can state from the public record today: the land is approved and rezoned; the site work permits are issued and current; the governing site plan was refreshed in autumn 2026; the builder owns the land in its own name; a model center has been permitted and addressed; both final plats are in county review; the whole site is mapped outside the special flood hazard area; and no community development district covers the land as things stand.
Things that are not released and that we will not invent: pricing, floor plans, home sizes, the product series, lot dimensions, street names, the homeowners association dues, the amenity program for the northwest neighborhood, and any completion or move-in date. Whether vertical construction has physically begun also cannot be verified from here, because unincorporated St. Lucie County does not publish an open building permit record, so the absence of a building permit in our research is not the same as there being none. We would rather tell you that plainly than present a confident blank.
A note on the name, because it causes real confusion. This project appears in the older county records under an entirely different name, the farming operation that owned the land before it was rezoned, and the two neighborhoods are referred to separately in the permit record as the northwest and northeast sites. Separately, there is a long established condominium community in Fort Pierce with a very similar name several miles south of here, and it accounts for essentially every real estate listing you will find by searching that name in this city. There are also same-named communities elsewhere in Florida, including another by the same builder. If you are researching this place, the location on Indrio Road is what pins it down, not the name.
Get on the Grove interest list
Be first in line. When pricing is published, when the plat records and the street names appear, or when the first homes are released, we will tell you. One message when something real changes, not a newsletter. If you would rather be introduced to a Florida agent now so that somebody is representing you from the first visit, say so in the form and we will arrange that instead.
How we can help, and how we are paid
Subdiview is run by a broker licensed in Illinois, not in Florida. That has a concrete consequence worth stating in plain language rather than burying: we cannot represent you in a Florida purchase and we are not your agent. What we do instead is refer you to a licensed Florida real estate professional who can represent you, and who can be with you from the first visit to the model, which is the point at which most new construction buyers accidentally give up their right to representation. We are compensated by that professional's brokerage, not by you. The referral costs you nothing and you are free to ignore it and simply use the updates.
We are not affiliated with D.R. Horton or with any builder or developer named on this page, and nothing here is an offer to sell or a statement on their behalf. Everything above is drawn from county and state public records and from published reporting, as of late October 2026. Approvals, plans, unit counts and dates all change. We have not searched civil court dockets for any party named here. Verify anything you intend to rely on, and get your own professional advice before signing a contract.
Common questions
Where exactly is The Grove?
On the north side of Indrio Road, just east of Interstate 95, in unincorporated St. Lucie County. Mail goes to a Fort Pierce address in the 34951 ZIP code, but the land is not inside the City of Fort Pierce and it is not in Port St. Lucie. Downtown Vero Beach is actually a little closer than downtown Fort Pierce.
Is The Grove selling homes yet?
No. As of late October 2026 no pricing, floor plans or square footages have been released, and no sales center or model home is open. Site work permits and the governing site plan are approved and a model center has been permitted and given an address, which is the step that normally comes before a sales launch.
Who is building The Grove?
D.R. Horton owns both development parcels in its own corporate name and is the permittee of record for the site work. The brand or series it will sell here, the floor plans and the pricing have not been published. Subdiview is not affiliated with D.R. Horton.
How many homes will there be?
The most recently approved plan for the northwest neighborhood is just over three hundred single-family homes, and the east neighborhood adds roughly a hundred and fifty more single-family homes alongside a separate multifamily component. Those counts have moved with each plan revision and will not be final until the plats record.
Is The Grove in a flood zone?
Both site areas are mapped outside the special flood hazard area, as an area of minimal flood hazard, on the current federal flood maps. That is the whole site, not just a center point. Flood maps are revised, and a lender or insurer will always rely on the determination for the specific address.
Will there be a CDD assessment?
No community development district covers this land today and none appears in the approval record. The land does sit inside an independent water control district with authority to levy a per-acre maintenance tax, and a CDD can still be created before closings, so ask for the full assessment picture in writing before you sign.
Are the homes age-restricted?
Nothing in the county record imposes an age restriction. The neighboring land-lease community along Spanish Lakes Boulevard is a separate, older manufactured-home community and its rules do not apply here.
When will homes be finished?
No date has been released and nothing here should be read as one. Both final plats were back in county review in October 2026, and a plat normally records before lots can be sold and vertical construction begins. Any timeline a builder gives at this stage is a target that moves.