Holland Hill, Holland, Texas

Holland Hill is a recorded 132-lot subdivision on the north side of FM 2268 at Krause Road, in unincorporated Bell County about three and a half miles from the town of Holland. Its plat was filed in May 2025. Its streets were graded that same summer and are still plainly visible from the air. The county issued 130 emergency-service addresses in May 2026. And yet there is no builder on title, no price, no floor plan and no model home. This is about as early as a community can be documented and still be real.

Join the interest list

That combination is unusual enough to be worth explaining carefully. Most pre-construction pages describe a builder's plans. There is no builder here to describe, so this page is built from the things that do exist: an appraisal roll, a plat index, a county address database, a sequence of dated satellite images, and the state utility maps. Where the record is silent, this page says so plainly, and on a project this early the silences are genuinely important.

Area
Holland, Bell County

What the ground shows, month by month

The most informative thing about Holland Hill is a sequence of dated satellite observations. They matter more than usual here because there is no builder narrative to check them against.

In November 2024 the tract was farmland: field patterns, nothing else. In early April 2025 it was still farmland under a green crop. By 23 May 2025 the whole tract shows broad surface disturbance, the scraping and clearing signature of mass earthwork beginning. By late July 2025 there is bright bare earth with a defined internal road network. By late August 2025 that network is fully legible, including the long loop street and both of its cul-de-sac bulbs. In October 2025 it was unchanged and the roads were still bright. By July 2026 the roads read as compacted while the lot interiors had begun to revegetate, and in early November 2026 the roads were still plainly there with the interiors gone green-brown, and with no visible structures of any kind.

So the earthwork began between 8 April and 23 May 2025, which is to say within days of the plat being filed. The developer closed on the land, filed the plat and moved equipment in essentially at once. The streets have now been in the ground for about eighteen months without a house going up on them, which is the practical reason this page can exist at all.

One honest technical note, because it changes how much weight the imagery deserves. The widely used high-resolution aerial layers are stale over this site: the current frame for this location was captured in March 2025, two months before any dirt moved, and two separate historical releases that should have bracketed the work both resolve to captures that predate it. Read only through those, this tract looks like untouched farmland, which is exactly the false negative that makes early communities look like nothing is happening. The month-by-month sequence above comes from a public ten-metre satellite archive instead, which is coarse but frequent and correctly dated. At that resolution a subdivision road prism is unmistakable while an individual house would not be, so the chronology is reliable and the absence of structures is corroborated separately by the appraisal roll showing no improvement value on any of the 132 lots.

To be sure the bright lines were the subdivision and not a field road, the 132 mapped lot polygons were overlaid on a near-cloudless October 2026 scene. The streets align with the platted centrelines: the loop, both bulbs, and the three shorter stubs.

The plat, and how its date was pinned

Holland Hill has a filed final plat, and that single fact separates it from the many announced projects that never reach one. It is worth being transparent about how the date was established, because the obvious source was unavailable.

The Bell County Clerk's own online index is behind a bot wall and could not be read. A commercial index that carries Bell County plat maps was reachable, and although it will not hand over a document without an account, it does reveal how many records a search matched. Searching the plat index by name returns exactly one instrument called Holland Hill. Narrowing the date range repeatedly and watching the match count fall to zero on either side pins the filing to a single day: 19 May 2025. The name search is exact rather than a prefix match, which was confirmed by searching the neighbouring subdivision Holland Hilltop Estates and getting its own separate records, so the single hit is not an echo of the neighbour.

Three further systems agree. Every one of the 132 parcels on the appraisal roll carries a lot-and-block legal description reading Holland Hill, Block and Lot with an acreage. A tract that had never been platted would carry an abstract or metes-and-bounds legal instead, so a block-and-lot legal on the roll is itself evidence of a recording. The county parcel fabric draws all 132 lot polygons under the subdivision's code. And the county's all-time dictionary of plat names, 9,138 entries deep, carries the code and the name.

What is still missing is the citation itself: the volume or cabinet, the page or slide, and the clerk's file number are all behind the paywall. So the record is confirmed and dated while its number is not, and this page does not invent one. The parcel fabric carries a date three months later than the filing, in August 2025, but that is the date the mapping office drew the lots rather than the day the plat recorded, and a lag of that size is normal here.

The lots

There are 132 lots in four blocks, holding 25, 27, 39 and 39 lots respectively, with two roll records carrying no block, most likely drainage or open-space parcels. The lots total 98.59 acres inside a gross footprint of roughly 110.6 acres; the difference of about twelve acres is street right-of-way.

Lot sizes run from 0.63 acres at the smallest to 4.24 acres at the largest, with a median near 0.69 acres and a mean around 0.75. That distribution is the single most useful thing to know about Holland Hill, because it places the subdivision in a different class from the production communities a few miles away. Two-thirds of an acre with a handful of multi-acre lots is rural-residential sizing. It usually implies larger setbacks, more distance between houses, room for outbuildings, and septic rather than sewer, all of which follow from the lot size rather than from anything a builder has promised.

The appraisal roll values each lot at 15,000 dollars of land, 1,962,000 dollars across the subdivision, with zero improvement value on every single one. That is consistent with everything above: finished or near-finished lots with nothing built on them.

Four street names carry assigned addresses. Spru Drive is the spine, a long loop with two cul-de-sac bulbs, and holds 78 of the 130 addresses. Medalist Street has 20, Cavalier Court 16 and Spectrum Court 16. Spru is spelled that way consistently in three separate county systems, so if it is a truncation it is one the county itself carries. Two more short segments, Donald Drive and Candlewood Drive, sit at the edges of the footprint with no addresses assigned, and whether they belong to this subdivision or to the adjoining fabric is not established. Two of the 132 lots have no address, which lines up with the two records that carry no block.

The county emergency-service addressing authority issued those addresses in two batches, 25 on 11 May 2026 and 105 the following day. That is an addressing-office record rather than an appraisal convenience, and it is a genuine signal that building permits were expected to follow. The count has not grown since, but the address layer itself has not been refreshed since mid-2026, so that should be read as no growth visible in a stale source rather than as no growth.

Who owns it

All 132 lots are held by a single limited partnership, Holland Hills Investors, chartered in Texas in April 2023 and active on the state franchise file. It acquired the land by one instrument dated 8 May 2025 covering the whole subdivision, and its mailing address on the roll is a suite in New Braunfels.

Not one lot has left the developer. The live ownership layer, which is fresher than the certified roll, still shows the partnership on 132 of 132 lots. There has been no builder takedown and no retail closing. That is the clearest possible confirmation that nothing here is for sale yet.

Beyond that the developer is hard to see. No website, brand, principals or engineer of record were identified, and searches on the entity name return essentially nothing. The New Braunfels suite is a shared registered-office address used by dozens of unrelated businesses, so it is not evidence of an affiliated group by itself. There are entities at the same address following a similar naming pattern for other projects, which is suggestive and was not verified, so it is mentioned here only to be set aside. Notably, no association entity for Holland Hill exists on the state franchise file and no county management certificate for it was found, which means that if the sponsor follows that pattern elsewhere, the association for this project has not been formed yet.

Where it is

The subdivision occupies the north side of FM 2268 with Krause Road along its east edge and Atkins Road forming the north boundary. It is outside every city limit; a point query against the county's city-limits layer returns nothing, which makes this unincorporated county land.

Straight-line distances from the centre of the tract: the town of Holland is about 3.6 miles away, I-35 at Salado about 5.4 miles, Salado itself 5.7, Bartlett 7.5, Belton 10.5 and Temple 15.0. Fort Cavazos and Killeen are roughly 24.7 miles away and Austin about 46.7. These are straight-line figures rather than drive times, and the practical answer for a commuter is governed by how quickly one can reach I-35 and how it is moving.

Being unincorporated changes a number of everyday answers. There is no city zoning, so what controls the lots is the plat and whatever restrictions were recorded with it. Law enforcement is the county sheriff, fire protection comes from a county emergency services arrangement rather than a city department, and road maintenance depends on whether the interior streets are accepted by the county, which is not established. It also means there is no city permitting counter: Bell County has no public building-permit or construction-plan portal for unincorporated land, which is why several questions on this page end in an honest blank rather than a document.

Schools

The county school district layer places the tract in Holland ISD. The district runs three campuses, one per level: Holland Elementary, Holland Middle School and Holland High School, serving something on the order of 670 students district-wide. Because there is a single campus at each level, there is effectively no attendance-zone question to resolve, though the district's own zoning document was not obtained and the assignment for this specific tract is therefore not formally established.

A small district is a real consideration either way, and it cuts in both directions depending on what a family wants. It is worth asking the district directly about capacity if 132 new households arrive over a few years, and about what it offers at the high school level compared with the much larger districts in Belton and Temple.

Utilities, and the question nobody has answered

This section is the most important one on the page, and most of it is a list of things that are not settled. In unincorporated Texas that is normal, and it is also exactly where buyers get caught.

Water first. Most of this tract falls outside every state-approved retail water service area. Seven test points inside the plat were checked against the state map of water service areas: six return no provider at all, and only the extreme southwest corner falls inside one, a water supply corporation serving the area to the southwest. The map itself is working correctly, which was confirmed by checking control points nearby that correctly return the town of Holland's own service area and another provider to the northeast. So the blank is a real gap rather than a failed query.

What that gap means is not established, and the possibilities are materially different for a buyer. The developer may be pursuing an amendment so an existing provider can serve the subdivision, or a line extension from Holland, or a private community water system, or individual wells on each lot. Those options differ in cost, in who maintains the system, in water pressure and fire flow, and in what a lender or insurer will want to see. Anyone seriously considering a lot here should make this the first question and should ask for it in writing.

Wastewater is simpler to predict and equally undocumented. No state-approved sewer service area covers the tract at all, which was again verified against a control point that correctly returns a nearby city system. With a 0.63-acre minimum lot size, on-site septic is the overwhelmingly likely arrangement, and the lot sizes are consistent with it. But no septic permit record and no package-plant filing were located, so septic here is a well-founded inference rather than a documented fact. Septic in unincorporated Bell County is administered through the county's designated representative, and the specific path for this subdivision is not established.

Electricity could not be determined. The only mapping layer available returns five overlapping service territories at this point, which is a known coarseness problem in that dataset rather than five genuine providers, so no provider is named here.

On flood risk, the federal flood map shows the subdivision as predominantly Zone X, which is described as an area of minimal flood hazard. A Zone A corridor, a special flood hazard area mapped without a base flood elevation, follows a creek along the southwest and clips the extreme southwestern corner of the footprint. Whether that corner is dedicated as open space or contains buildable lots is not established, and flood maps are revised over time, so a specific lot should be checked against the current map and against the plat's own drainage dedication rather than against this description.

What is around it

The nearest direct comparable adjoins to the north on Lindemann Road. Holland Hilltop Estates is a small earlier subdivision whose six addresses were created in the spring of 2024 and whose lots, at roughly two and a half acres each, are already held by individual named owners rather than by a developer. It is a useful picture of how this corridor absorbs rural-residential lots: slowly, individually, and without a production builder involved.

The wider market frame is worth stating because it is easy to misread. Bell County is heavily built by national production builders, but they are concentrated in the cities and in Holland proper. The two priced communities a short drive away are from national builders on conventional subdivision lots, and their product has little in common with two-thirds of an acre on a county road. Holland Hill's lot sizes put it in a different class, which affects who is likely to build here and what it will cost to do so.

What is not established

Gathered in one place, because on a community this early the gaps are the most useful part of the page. There is no builder and none has been announced. There is no price, no product type, no home size, no plan name and no launch date, because without a builder none of those exist. The plat's volume, page and file number are behind a paywall. The developer's principals, brand, engineer and surveyor are unidentified. No association, no recorded restrictions, no dues and no architectural controls were found. The water supplier and the mechanism for serving the site are unresolved, septic is inferred rather than documented, and the electric provider is unknown. Whether the interior streets are paved to county standard and will be county-maintained is unknown, as is the drainage and detention design. No construction-plan approval is on file anywhere public, because no such portal exists for unincorporated land here. Two large listing aggregators are closed to automated access, so a price behind one of them could not be excluded; that is recorded as unverified rather than as an absence.

How to use a window like this

A subdivision with graded streets, assigned addresses and no builder is a narrow and genuinely useful moment, but it is useful for information rather than for a discount. There is no price to negotiate and nothing to reserve. What it offers is time to decide whether this is the right piece of ground before anyone is asking for a decision.

The work is mostly questions, and on a rural lot they are different from the questions that matter in a production subdivision. Which lots touch the creek corridor and the flood corner. Which back onto the open-space parcels and which onto a neighbour. Where the water is coming from and who maintains it. Whether a septic system will fit the house footprint and the lot's soils, since that constrains the house more than any plan does. Whether the streets will be county-maintained. What restrictions were recorded with the plat, since on unincorporated land those restrictions, not city zoning, decide whether a workshop, a barn or a second dwelling is allowed. Whether the multi-acre lots are priced per acre or as premium lots, once there is any pricing at all.

It is also worth knowing how this kind of subdivision typically reaches the market, so the next move is not a surprise. A developer holding all the lots either sells them to one builder, which produces a conventional community with plans and prices, or sells them individually to buyers who bring their own builder, which produces something much more varied and usually slower. Those two outcomes feel completely different to live in, and nothing in the record yet says which one this will be. That is the single most consequential thing to watch for here, and it is precisely what an interest list is for.

Get on the Holland Hill interest list

Add your name and we will tell you what changes: when a builder takes title or is announced, when lots are offered, when a price appears, and when the water and wastewater arrangements become a matter of record. No pressure and no obligation. Get notified when something moves.

Joining the interest list is free, creates no brokerage relationship, and does not obligate you to anything. Subdiview is operated by a real estate broker licensed in Illinois and is not licensed in Texas. Your information is referred to a real estate professional licensed in Texas, who will contact you directly and can register you as represented before your first visit to a sales office.

About this page

Subdiview publishes research pages on new-construction communities, built from the public record. This one was assembled from the Bell County appraisal roll, parcel fabric and ownership layers, the county emergency-service address database, the county road centreline file, the Bell County plat index, the Texas franchise taxpayer file, state water and sewer service-area maps, the federal flood map and a dated public satellite archive. Subdiview is operated by a real estate broker licensed in Illinois. No one at Subdiview is licensed in Texas, and Subdiview is not your agent in Texas.

We are not affiliated with the developer of this subdivision, with any homeowners association, water supply corporation, school district or governmental body named on this page, and nothing here is authorised by them. No homebuilder is named on this page because none is on record.

If you ask us for help buying here, we will refer you to a real estate professional licensed in Texas who can represent you. We are compensated by that professional's brokerage, not by you. You are free to work with anyone you like, or with no one. Nothing on this page is an offer to sell, a solicitation of an offer to buy, or financial, tax or legal advice, and facts about an unbuilt community change often. Verify anything that matters to your decision directly with the county, the district and the developer before you rely on it.

Common questions

Who is building homes in Holland Hill?

Nobody yet, as far as the public record shows. All 132 lots are still held by the developer entity, no homebuilder appears on title anywhere in the subdivision, and no builder has been announced. That is the main reason this community has no price and no plans to look at.

Is the plat recorded?

Yes. The Bell County plat index contains exactly one instrument named Holland Hill, filed 19 May 2025. The volume, page and clerk file number are behind a paywall and are not reproduced here, so the record and its date are confirmed while the citation number is not.

How big are the lots?

The 132 lots total 98.59 acres. The smallest is 0.63 acres and the largest is 4.24 acres, with a median of about 0.69 acres. That is rural-residential sizing rather than production-subdivision sizing, and it is a different product class from the priced communities in Holland proper.

Where will the water come from?

This is the biggest open question on the site and it is genuinely unresolved. Most of the tract falls outside every state-approved retail water service area; only the extreme southwest corner is inside one. Whether the plan is a service-area amendment, a line extension, a community system or individual wells is not established, and it is the first thing to ask.

Is there sewer, or septic?

No state-approved sewer service area covers the tract. With lots of this size, on-site septic is the overwhelmingly likely arrangement, but no septic permit record or package-plant filing was located, so treat septic as a well-founded inference rather than a documented fact.

Which schools serve Holland Hill?

The county school district layer places the tract in Holland ISD, which operates one campus per level: Holland Elementary, Holland Middle School and Holland High School. Because there is one campus per level there is effectively no attendance-zone choice, though the zoning document itself was not obtained.

Is Holland Hill the same as Holland Estates or Holland Hilltop Estates?

No. Holland Estates and Harvest Meadows are separate, already-priced communities from national builders, and Holland Hilltop Estates is a small earlier subdivision adjoining to the north whose lots are already owned by individuals. Holland Hill is its own plat, one of 9,138 ever recorded in Bell County under that exact name.