Be first in line

Clearview Estates: acre homesites coming near Springtown

Clearview Estates is an eighty-four lot community on roughly one hundred and eight acres of former hayfield in unincorporated Parker County, a couple of miles outside Springtown and reached from Goshen Road. Every lot is a full acre or better, because out here the county says it has to be. The final plat was approved by the county in the autumn of 2025, construction security was accepted at the same meeting, and the county addressing authority assigned street addresses to the lots within days. The ground has been graded into a road loop with two cul-de-sac bulbs, a stormwater pond and a second detention basin. No home has been started, nothing has sold, and no builder, price, floor plan or opening date has been released for this community.

That gap is the reason this page exists. A community is at its most interesting to a buyer in the window between the dirt moving and the marketing starting, because that is when you can still think clearly about whether an acre in unincorporated Parker County is the life you want. Everything below is compiled from public records, with the honest gaps left visible as gaps.

Join the interest list

Area
Springtown, Parker County

What is released and what is not

Details on this page are compiled from public entitlement records and are targets, not commitments. Pricing, floor plans, home counts, and timing have not been released by the builder and are subject to change without notice.

On the record now

Not released yet

About the community

Eighty-four lots across roughly one hundred and eight acres is a low-density plan by any modern North Texas standard. After streets, drainage and open space, the lots themselves account for something close to ninety-six acres. Most are almost exactly an acre; a handful of corner and irregular lots run larger, up to a little over two acres. There is no alley plan, no shared-wall product and no small-lot section: this is a single-family detached community of full-acre homesites and nothing else.

The layout is a long loop off Goshen Road with two cul-de-sac bulbs, the standard shape for an acre-lot subdivision in this county: it keeps through traffic out and gives most lots a quiet frontage. Five street names have been formally assigned: Clear Creek Loop, which carries the bulk of the lots, Clear Sky Court West, Clear Sky Court East, Clear Creek Drive, and Goshen Road itself at the entrance. Those five are the assigned names in the official address record. Street names drawn on an early plat do not always survive addressing, so if you encounter a different name attached to this community, treat it as provisional.

The prior use was agricultural. Imagery from the first half of 2025 shows open hayfield across the whole tract with no structures on it: no demolition, no prior industrial use, no legacy foundations to work around. By late 2025 the road loop and both bulbs had been cut and the detention basins shaped. More recent satellite imagery is consistent with the street corridors having been surfaced since then, though publicly available resolution is not fine enough to confirm that as a fact, and no homes have been started on any lot.

Location, access and what living here is honestly like

The community sits about a mile and a half from the centre of Springtown as the crow flies, which puts groceries, schools, fuel and the everyday errands genuinely close. This is not a remote tract an hour from a shop. Azle is about eleven miles away in a straight line and is the nearest full-service town of any size. Weatherford, the county seat, is about fifteen miles, and downtown Fort Worth about twenty-six. Every one of those is a straight-line distance from the middle of the subdivision, not a drive time, and on roads like these the two are not the same thing.

Access is from Goshen Road, and the through route is State Highway 199, the Jacksboro Highway, which runs just north of the site. Head southeast on 199 and it carries you through Azle, past Lake Worth, and into Loop 820 on the northwest side of Fort Worth. That is the commute, and it is the most important thing to test for yourself before you buy here. Drive it at the hour you would actually drive it, in both directions, because the stretch through Azle is what decides whether this works for your household. We have deliberately published no drive-time figure, because a straight-line distance dressed up as a commute is the commonest dishonesty on pages like this one.

For weekends, the water is the draw. Eagle Mountain Lake and Lake Worth are the two big recreational reservoirs on Fort Worth's northwest side, both within a reasonable drive, with boat ramps, marinas and lakeside restaurants. Springtown itself has the small-town fixtures: a historic square, school sports the whole town turns out for, and a local calendar that functions as a social life if you engage with it. Parker County beyond the town is working horse and cattle country.

Here is the honest version of life on an acre out here. The appeal is specific: room for a shop, a barn, a garden, a few animals or simply distance from your neighbours; a driveway you can park a trailer on without a letter arriving; dark enough skies to see stars; quiet that is not a marketing word. The tradeoffs are equally real. You own your septic system and your driveway. Your water comes from a rural supply district rather than a city main. Trash collection is a private contract you arrange. Emergency response comes from a county emergency services district working with the volunteer fire department rather than a city department, though one of that district's fire stations is on Goshen Road itself, which is unusually close cover for an unincorporated tract. Mowing an acre is a real weekend job and a real piece of equipment. People who want this life want it specifically, and people who do not should find that out before closing.

The other thing to understand is that unincorporated Parker County has no zoning at all. This cuts both ways and a buyer deserves both halves. In your favour: nobody is going to tell you what colour to paint the shop or how many vehicles can sit on your own acre. Against you: there is no zoning map protecting what goes up on the land across the road either. The county's subdivision rules govern how land is divided and what lot sizes are allowed, not what use a given tract is put to. In practice, the real control on what happens inside a platted community like this one is the recorded deed restrictions rather than any public zoning ordinance, which is exactly why you should read those restrictions before you sign anything.

Utilities, septic and the cost of an acre

Water here comes from a special utility district, a rural water supply system serving this part of the county. That is a meaningful advantage over the alternative most buyers expect on an acre lot, a private well: no well to drill, no pump to budget for replacing, no private water testing to keep up with. It is not city water either. Service is metered, a meter or tap fee applies, and capacity in a rural district is finite, so ask about it before you commit.

There is no sanitary sewer and there will not be. Every home will be served by its own on-site septic system, permitted through the county health department. This is the single biggest practical difference between buying here and buying a city lot. The system is a real cost on a new build, and its design depends on the soil on your particular acre, which is why two neighbouring lots can carry noticeably different septic costs. It needs periodic pumping and inspection for as long as you own the house, and some types need a service contract. Lenders and appraisers frequently want a septic inspection as a condition of closing, so raise it with your lender at pre-approval rather than three days before funding. The system also dictates where the house, the driveway and any future outbuilding can sit on the lot.

This is also the reason every lot here is a full acre. Parker County's subdivision rules set a one-acre minimum lot size, and specifically require at least one acre for any lot not served by sewer. With septic rather than sewer, the acre is the regulatory floor. It is worth saying plainly, because the acre gets marketed as luxury and it is actually a wastewater rule. It is also why one-acre subdivisions are the ordinary shape of new development across unincorporated Parker County rather than an unusual one.

On fuel, nothing has been published about whether natural gas will be available to these lots or whether homes will run on propane, which is common in unincorporated parts of the county. We are not going to guess at it. It is a real monthly-cost question and a real appliance question, so ask it directly when a builder is named. Get notified when utility details are published.

Texas cost reality: taxes, MUDs and what you will actually pay

Texas has no state income tax, and the trade for that is property tax. On a new community the property tax stack is the number that decides affordability, and it is also the number most often got wrong, so here it is carefully.

There is no municipal utility district here and no public improvement district. That matters more than it sounds. In the Houston and Austin metropolitan areas a MUD assessment is routinely the unpleasant surprise that arrives after a buyer has already done their sums, and it can add a full dollar per hundred dollars of value to the bill. This community has none, because its water comes from an existing rural supply district rather than a newly created taxing district. There is also no city property tax, because the land is unincorporated: being inside a city's extraterritorial jurisdiction does not make you a city taxpayer in Texas. Those two absences are a genuine, quantifiable advantage over a comparable new community inside a city or inside a MUD.

For the most recent tax year with fully adopted and reconciled rates, which is 2025, the stack on an unincorporated tract in this school district comprised the county general and debt rate, the county lateral road rate, the junior college district, and the county hospital district, which together came to about forty-eight cents per hundred dollars of assessed value, plus the school district at about one dollar and three cents. Those two together are roughly one dollar and fifty-one cents per hundred dollars. On top of that, an emergency services district levies in this part of the county, typically around ten cents, which brings the all-in figure to somewhere near one dollar and sixty-one cents per hundred dollars for tax year 2025.

Two honest qualifications. First, we confirmed that an emergency services district levies on unincorporated land here, but not which numbered district covers this tract or its exact rate, so treat that component as approximate and confirm it against an actual tax bill or with the county. Second, these are the most recent adopted rates we could fully reconcile against the county's own published filings. The county's own general and lateral road rate for the following tax year was proposed slightly lower, at the no-new-revenue rate, but adopted rates for the school district, the college, the hospital district and the emergency services district for that later year were not obtainable at the time of writing. Get notified when current-year figures are confirmed.

If you occupy the home as your primary residence you can claim the Texas general residence homestead exemption, including the school district homestead exemption, and the ten percent annual cap on increases in the appraised value of a homestead. Those apply here exactly as they would anywhere in Texas; nothing about the unincorporated position changes them. Expect the first year's tax bill on a new build to be unrepresentative, because the land is often still assessed without the finished home on it and without your homestead in place, and budget for the correction in year two. That is a normal and well-documented new-construction surprise, and it is not specific to this community.

On the market around it, as of late 2026 the one-acre homesites listed openly in the Springtown area and northern Parker County generally ran from roughly the low sixty thousands for a bare acre upward, with modest finished houses on an acre listed around the low two hundred thousands. Those are listings elsewhere in the surrounding area, with their own circumstances, and they are offered here only as a rough frame for the submarket. Nothing about this community's own pricing has been released and nothing above should be read as a forecast of it.

Schools

The land is inside the Springtown Independent School District boundary. We say that with confidence because it is confirmed from district boundary mapping and the county appraisal record, not from the mailing address. That distinction genuinely matters here: Azle Independent School District also reaches into this part of northern Parker County, and a Springtown postal address does not by itself settle which district a tract falls in. Plenty of listing pages in this area get it wrong.

Springtown High School is the district's only comprehensive high school, so that one is determinate. The district also runs Springtown Intermediate and Springtown Middle as a district-wide grade-band split rather than as two separate attendance areas, which means those assignments do not vary by address within the district either.

The elementary campus is the open question and we are not going to guess at it. The district operates three elementary campuses and we could not obtain a published attendance boundary that resolves this tract to one of them. Naming the nearest one would be guessing, and school assignment is exactly the kind of fact a family decides on, so confirm the elementary campus directly with the district. Boundaries are also redrawn as districts grow, so verify at the time you buy rather than trusting a page. Get notified when campus assignments are published.

Which Clearview is this?

Worth a moment, because the name is not unique in this county. Parker County records carry three separate Clearview subdivisions: an older Clearview Addition, an older Clearview Oaks, and this one, Clearview Estates. They are three different places, and the two older names have been in the county record far longer than this one.

The practical consequence is that search results, listing feeds and map pins keyed on the bare word Clearview will mix them together, and an address that looks like a match may belong to a community platted decades ago somewhere else in the county. If you are tracking this community, anchor on the full name, Clearview Estates, together with Goshen Road, Springtown and Parker County. If a listing or a portal record does not line up with all of those, it is probably one of the other two.

Buying new construction with representation

No builder has been named for this community in the public record yet, so there is no builder to be affiliated with and none is named on this page. Subdiview is not affiliated with, endorsed by or sponsored by any builder or developer involved with this community. All community information here is compiled from public records and is subject to change.

When a builder does arrive, the most consequential decision you will make happens before you ever discuss a floor plan. In new construction the person sitting in the sales office works for the seller. They are frequently knowledgeable and pleasant and genuinely useful, and their legal duty still runs to the builder, not to you. Their job is to sell the builder's inventory on the builder's terms.

If you want someone whose duty runs to you, bring your own agent, and bring them before your first visit. Almost every builder requires that your agent be disclosed or present at your very first registration. Walk in alone, sign the visitor card, and you can permanently forfeit representation on that community, even if you buy six months later. It is the most expensive mistake buyers make in new construction, and it costs nothing to avoid.

Representation earns its keep on a pre-construction purchase specifically. The builder's contract is drafted by the builder's lawyers and is not the balanced document a resale contract is. Someone should be reading the completion and delay provisions, the escalation and allowance language, the warranty terms and what happens to your deposit if the project stalls. An acre-lot community adds items a city lot does not have: the septic design and who pays for an upgraded system if the soil requires one, the water meter and tap, the driveway and culvert, and the recorded restrictions governing what you can build afterwards. Those are the points where someone in your corner pays for itself.

Get on the Clearview Estates interest list

Join the list and you will hear when the unreleased things become released: a builder, pricing, floor plans, the recorded restrictions and an opening date. Nothing is for sale here today.

Subdiview is operated by a real estate broker licensed in Illinois. We are not your agent, we do not represent you, and we perform no real estate brokerage services in this state. No one at Subdiview is licensed in this state. If you join an interest list, your information is referred to a real estate professional licensed in the state where the property is located, who will contact you directly. We are compensated by that professional's brokerage, not by you.

Joining the interest list is free, creates no brokerage relationship, and does not obligate you to anything. Subdiview is operated by a real estate broker licensed in Illinois and is not licensed in Texas. Your information is referred to a real estate professional licensed in Texas, who will contact you directly and can register you as represented before your first visit to a sales office.

Questions about Clearview Estates

Has pricing been released for Clearview Estates?

No. No price, no price range, no monthly payment figure and no lot price has been published for this community. The one-acre homesites around Springtown and northern Parker County that were on the open market in late 2026 ranged from roughly the low sixty thousands for a bare acre to the low two hundred thousands for a modest finished house on an acre, but those are other people's listings in the surrounding area, not this community's numbers. Treat them as context for the submarket and nothing more. Join the interest list and you will hear when real pricing exists.

Who is building the homes?

No builder has been named for this community in the public record yet. The approval record names a developer for the subdivision itself, which is the party that platted the land and posted the construction security, but that is not the same thing as a named homebuilder with published plans and prices for these lots. Until a builder is on record for Clearview Estates, this page will not name one. Subdiview is not affiliated with any builder or developer involved here.

What stage is the community actually at?

Further along than a drawing and well short of a model home. The final plat was approved by the county in the autumn of 2025 and construction security was accepted at the same meeting. Street addresses for the lots were assigned by the county addressing authority within days of that approval. On satellite imagery the site went from an open hayfield to a fully graded road loop with two cul-de-sac bulbs, a stormwater pond and a second detention basin, and more recent imagery is consistent with the street corridors having been surfaced since. No homes have been started and nothing has sold.

Is this the same Clearview as the other Clearview subdivisions in the area?

No, and this catches people out. Parker County records carry three separate Clearview subdivisions. Two of them, a Clearview Addition and a Clearview Oaks, are older, separate places with their own histories. This one is Clearview Estates, off Goshen Road in unincorporated Parker County near Springtown. If a search result, a listing feed or a map pin says only Clearview, check the full name, the road and the county before you assume it is this community.

Is the mailing address Springtown? Is the community in the city?

The mailing community is Springtown and the ZIP is 76082, but the land is not inside the Springtown city limits. It is unincorporated Parker County, inside the city's extraterritorial jurisdiction. That distinction matters for your money and your expectations: there is no city property tax, and there are also no city utilities, no city trash service and no city police patrol. A Springtown mailing address is a postal fact, not a jurisdictional one.

What are the streets called?

Five street names have been formally assigned to the lots here by the county addressing authority: Clear Creek Loop, Clear Sky Court West, Clear Sky Court East, Clear Creek Drive, and Goshen Road itself at the entrance. Those are the assigned names. Names that appear on an early plat drawing sometimes do not survive the addressing process, so if you see a different street name attached to this community, treat it with caution until it shows up in the address record.

Where does the water come from, and is there sewer?

Water is supplied by a special utility district, which is a rural water supply system rather than a city main and rather than an individual private well. That is genuinely better than a well for most buyers: no drilling cost, no pump to replace, no private water testing burden. There is no sanitary sewer. Every home here will be on its own on-site septic system, permitted through the county health department. That is the single biggest practical difference between this and a city lot.

What should I know about septic before I buy?

Three things. First, cost: the system is a real line item on a new build and its design depends on the soil on your particular acre. Second, maintenance: septic systems need periodic pumping and inspection, and some system types need a service contract, so there is an ongoing obligation a city sewer bill does not carry. Third, financing and closing: lenders and appraisers frequently ask for a septic inspection, and some loan programs have specific requirements, so raise it with your lender early rather than late. The system also constrains where the house, the driveway and any future shop can sit on the lot.

Why are the lots a full acre each?

Because the county requires it. Parker County's subdivision rules set a minimum lot size of one acre, and specifically require at least one acre for lots that are not served by sewer. With septic rather than sewer here, one acre is the regulatory floor. That is worth understanding: the acre is a rule about wastewater, not a luxury positioning decision, and it is why one-acre subdivisions are the normal shape of new development across unincorporated Parker County rather than an unusual one.

Is there a homeowners association, and are there deed restrictions?

Nothing has been published about an association, its assessments, or the restrictions that will run with these lots. A recorded plat in Texas routinely comes with recorded restrictions, and those restrictions are usually the real governing document for what you can build and keep on your acre, so they matter more here than zoning does. Ask for the recorded restrictions in writing before you sign anything, and read the section on outbuildings, livestock, vehicles and manufactured housing first.

Is the site in a flood zone?

The subdivision is mapped outside the special flood hazard area on the current federal flood mapping, across the whole platted tract rather than just part of it. The plat does include a stormwater pond and a second detention basin, which is ordinary drainage infrastructure for a subdivision of this size and is not an indication of a flood problem. Flood maps are revised from time to time, so confirm the current mapping for the specific lot before closing and ask your insurer what they will quote.

Which schools will children here attend?

The land sits inside the Springtown Independent School District boundary. That is confirmed from district boundary mapping and the county appraisal record rather than from the mailing address, which matters because Azle Independent School District also reaches into this part of northern Parker County and a Springtown postal address does not by itself settle the district. Springtown High School is the district's only comprehensive high school, and the district runs Springtown Intermediate and Springtown Middle as a district-wide grade-band split. The elementary assignment is the open question: the district has three elementary campuses and no published attendance boundary that resolves this tract, so confirm the elementary campus directly with the district before you rely on it.

Should I bring my own agent, and when?

Yes, and before your first visit to any sales office, not after. In new construction the on-site sales representative works for the seller. They are often genuinely helpful, but their duty runs to the builder, not to you. Most builders will only recognise your agent if that agent is disclosed or physically present at your very first registration, and walking in alone can permanently forfeit your right to representation on that community. Registering as represented costs you nothing and changes who is obliged to look after your interests through contract, inspections and closing.

Before you rely on anything here

Subdiview is operated by a real estate broker licensed in Illinois. We are not your agent, we do not represent you, and we perform no real estate brokerage services in this state. No one at Subdiview is licensed in this state. If you join an interest list, your information is referred to a real estate professional licensed in the state where the property is located, who will contact you directly. We are compensated by that professional's brokerage, not by you.

Subdiview is not affiliated with, endorsed by or sponsored by any builder or developer involved with this community, and no builder has been named for it in the public record. Community names are used here for identification only. Everything on this page is compiled from public records, is reported as it stood in late 2026, and is subject to change without notice. Approvals are reported as approved; any timing is a target rather than a commitment. Verify anything you intend to act on with the county, the school district and your own professional advisers.