River Farm Phase 2, Belton, Texas

River Farm Phase 2 is the largest phase so far of a master-planned community on the north bank of the Lampasas River, about a quarter mile east of Interstate 35 and four miles south of downtown Belton. Its street grid is already graded and visible from orbit, the county has assigned 166 addresses to it, and a 10.8 million dollar infrastructure filing covers its 164 homesites. What it does not have is a recorded plat, a named homebuilder, or a price. That combination is the whole reason this page exists.

Join the interest list

Everything below comes from Belton's planning records, the county appraisal and addressing systems, state accessibility filings, the act creating the utility district, dated satellite imagery and the developer's own material. On the two questions buyers care most about, the builder and the price, the record is silent, and this page says so rather than filling the gap.

Area
Belton, Bell County

What is on the ground right now

The clearest evidence is physical. A year-over-year pair of satellite exports, with the city's own Phase 2 boundary drawn on top of both, gives an unusually clean answer.

In the window from mid-October to late November 2025, inside the Phase 2 boundary, there was a bright cleared patch at the northwest corner and a single linear scar running southwest. Everything else was intact pasture and cropland. In the same window a year later, the same boundary contains a complete subdivision street grid: a spine road with branch streets and at least three cul-de-sac bulbs, all in bright exposed base course, plus a graded corridor continuing southeast across the tract toward a crossing at the river. Immediately north, inside the Phase 1A boundary, there is a large graded pad and a basin.

That is dated, year-over-year site work inside the Phase 2 polygon specifically, not merely somewhere on a 478-acre master plan. Roads and drainage are in. Vertical construction is not: no foundations, slabs or framed structures are visible, and none should be expected until the plat records.

A technical caution, because it would have produced the opposite answer. The high-resolution aerial basemap is badly stale over this tract: its captures here date from late 2024 and April 2025, and two historical releases that ought to have bracketed the past year both redraw those same old frames. Read only through them, this site looks like unbroken pasture. The pair above comes from a ten-metre satellite archive with reliable acquisition dates instead.

The state accessibility filings corroborate it. Five filings sit at the site address, all by the same engineer. Two registered in March 2025, covering Phase 1A infrastructure and sidewalks and the first phase of Toll Bridge Road, now read as inspection complete, which means a registered accessibility specialist has inspected work actually built. Two more carry Phase 2: identical values of 10,838,178 dollars over 3,145,163 square feet under two different scope descriptions, one registered in October 2025 for 164 residential lots and associated supporting infrastructure, the other in February 2026 for sidewalks and infrastructure. They are the same project filed twice, which is normal and is why the whole set has to be read rather than any single number.

Two readings follow. The disturbed area on the Phase 2 filing, about 72.2 acres, closely matches the platted 72.062 acres, so the filing and the plat describe the same ground. And a sidewalk scope at that value is no trim item: sidewalks follow the roads and utilities, so a February 2026 sidewalk filing describes a project whose roads and utilities were already going in. That is roughly 66,000 dollars of infrastructure per residential lot.

One trap to flag, since it is easy to find and easy to misread. A local headline reports River Farm beginning 14.1 million dollars in new home construction. That figure describes infrastructure and sidewalk filings, not houses. No homes are under construction.

The approval record, stated precisely

River Farm Phase 2 is entitled and under construction but not finally platted, and the difference matters enormously to a buyer.

What is approved is substantial. The Texas Legislature created River Farm Municipal Utility District No. 1 of Bell County in 2021, an adopted statute and the strongest entitlement instrument on the file. Belton approved an original preliminary plat in early 2022 and a revised General Development Plan in April 2025 for the roughly 481-acre site, replacing a townhome component with a larger patio-home product. On 11 August 2025 the Belton City Council approved the Phase 2 plat by name and by count, 164 residential lots and 10 homeowners-association lots on 72 acres, alongside the Phase 1 preliminary plat. A development agreement permits up to 1,775 units. Phase 1A's final plat is approved and recorded, and its clerk instrument number is carried in the city's own planning layer. There has been a groundbreaking, attended by the developer's executives, the family that sold the ranch and Belton's mayor.

None of that is an application, a staff report, a recommendation or a deferral. It is adopted governing-body action, which is what the approval question turns on.

What is not approved is the final plat for Phase 2 itself. The city's planning layer records it as under review, with 174 lots and 72.062 acres. That status is current rather than stale: every River Farm record in that layer was last edited on 20 November 2026, five days before this research. Two further systems agree that nothing has recorded. The county's all-time dictionary of plat names, which runs past the current appraisal roll ceiling and therefore does capture recent recordings, contains the two Phase 1A codes and no Phase 2 entry at all. And the commercial index that covers Bell County plat maps stops in December 2025, so it cannot speak to a 2026 recording either way; its silence is not evidence and is not treated as any.

The practical consequence is simple and absolute. Until that plat records, the Phase 2 lots do not exist as legal parcels, so no lot can be conveyed and no home can close. All three parcels covering this land remain in the developer's name on the appraisal roll, totalling about 461 acres described as part of the remainder of a 477-acre tract. Not a single lot has been conveyed to anyone, which is also the cleanest possible answer to whether anything here is for sale.

Phase 2 by the numbers

Three different lot counts circulate for this phase and they are not in conflict once sorted. The city's planning layer records 174, which is the total platted lot count. The city's own August 2025 announcement and the accessibility filing both give 164, which is the residential count. The remaining 10 are homeowners-association lots carrying open space and walking trails. The county has assigned 166 addresses, which is the 164 homesites plus two non-residential points. A round figure of about 180 appears in one news account and is the least reliable number in the set.

So: 164 homesites and 10 association lots, 174 in total, on 72.062 acres, a gross density of about 2.3 homesites per acre. Phase 2 is more than twice Phase 1A's lot count and more than three times its acreage, which makes it the largest single phase on the books and explains why it carries the largest infrastructure filing.

The city set two lot standards for this phase: single-family homes on lots of at least 5,000 square feet, and patio homes on lots of at least 3,600 square feet. Which of the 174 lots fall into each category, and where they sit within the phase, is not established and is a sensible early question, because a 3,600-square-foot patio lot and a 5,000-square-foot single-family lot are materially different products on the same street grid.

Geographically Phase 2 sits immediately south and southeast of Phase 1A, running down the north bank of the river, while Phase 1A fronts Toll Bridge Road at the northwest corner of the tract.

The streets

Eight street names already carry assigned addresses in Phase 2, and none of them appears in any listing anywhere yet: Sparrowhawk Street with 42 addresses, Texas Star Court with 33, Cowbird Circle with 26, Egret Road with 24, Yellowstar Drive with 22, Kingfisher Road with 12, Lilyturf Lane with 6 and Canopy Boulevard with 1.

The county addressing authority issued those points between late July 2025 and May 2026. That is an addressing-office record rather than an appraisal convenience, and because this site is unincorporated the county's subdivision field is populated for it, which makes the record usable as a genuine construction signal.

The naming runs on two tracks, birds and native plants, and Phase 1A follows the same scheme with Warbler Road, Viridian Drive, Barn Owl Drive and Cornflower Cove among others. That consistency suggests the phases were laid out as one piece.

About that price range

A range circulates widely as River Farm's pricing and it needs handling carefully, because it is the single most misleading thing in the public record about this community.

Nobody has published a price for River Farm. The community's own website carries no starting price, no price range and no monthly payment anywhere. The only price-shaped element on it is a dropdown in a contact form offering 300s, 400s and 500s as inquiry filters, with no currency, no units and no attachment to any home. That is a lead-capture field, not an offering. The site also carries a blanket notice that its content should be considered concept only and subject to change, and it is written in the future tense throughout.

The circulating figure traces to a press release the developer issued at the December 2021 land acquisition, dated early January 2022, which said that home prices were expected to range from the low 300s to the 600s and up. Local newspapers have repeated that range several times since, sometimes rendered as the low 300,000s to the mid 600,000s, and one paper noted openly that it could not say whether the figures were still current.

So the honest statement is this. The only pricing figure of record is an expectation the land developer stated five years ago, before any builder was selected and in a different interest-rate environment. It is not a builder's price and not a price on the community's own site.

The reason no builder price exists is that no homebuilder has been named. The community's builders page says the builders will be announced later. Local coverage reports the developer will work with its own builders and with local builders, naming none. No builder's own website publishes a River Farm community in Belton. Until that changes there is no plan range, no square footage, no warranty and no base price to compare, because none of those exist yet.

The wider community

Phase 2 is one piece of a master plan on the former Utley Ranch, bought by the developer from the family that had held it, in December 2021. The acreage is reported variously as 478, 478.5, about 481 and 486 acres depending on the document, and the county's three parcels total about 461 acres of a 477-acre parent tract, so the honest figure is a range of roughly 478 to 486 acres rather than a single number.

The unit count works the same way. The development agreement permits up to 1,775 units, the April 2025 revised plan shows about 1,617, and the original acquisition coverage said 1,500 to 1,600. The fair framing is approved for up to 1,775 and currently planned at about 1,617, roughly 266 of them patio homes. Full buildout is expected to take around ten years across eight phases. At completion the community could add more than ten per cent to Belton's population of roughly 26,000, which matters for both traffic and school capacity.

The developer names Farmhouse, Texas Hill Country and Tudor Revival as the intended architectural styles, and has said it wants to convert the ranch's existing barn into an amenity centre. The published amenity list includes two amenity centres, a 4,500-square-foot resort-style pool, pickleball courts, a playground, a pavilion, a linked trail system and river frontage.

Every one of those is published under the site's own concept-only notice, none is built, the imagery shows no amenity construction, and no phase is tied to their delivery. For a first-phase buyer that is the important caveat about large master plans: what a rendering shows is not what the earliest residents live with.

Schools

The community is in Belton ISD, confirmed on the developer's own education page. The schools the developer lists are a new-technology high school, Belton High School, Belton Middle School and the district's early childhood school. That is the developer's list rather than an attendance-zone assignment of record, and the specific elementary, middle and high school zones that will apply to Phase 2 addresses are not published. Zoning for an unbuilt phase in unincorporated county land generally is not.

More interesting is that a dedicated school site sits inside the subdivision footprint, confirmed by the city's own announcement. The district has discussed a neighbourhood school there and the mayor raised those discussions at the groundbreaking, but no decision has been reported. Which school, what grades, what timeline and whether it is funded are all unestablished. A school site on a plat is land set aside, not a committed campus, and the difference is one to raise with the district rather than with a sales office.

The utility district, and what it means on a tax bill

This is the item most likely to change a monthly payment, so it is worth understanding before anything else about cost.

River Farm Municipal Utility District No. 1 of Bell County was created by act of the Texas Legislature in 2021. The bill analysis describes a district of about 304.8 acres inside Belton's extraterritorial jurisdiction with powers over water, sewer, drainage and road facilities, authority to issue tax-exempt bonds, to impose taxes, assessments and fees, a limited power of eminent domain, and authority to divide into two or more districts. It is the county's third such district and Belton's second.

The mechanism is standard and worth stating plainly. A district borrows to build the water, sewer, drainage and road infrastructure a subdivision needs, and repays that debt through a property tax levied on the homeowners who eventually live there, on top of county and school taxes. The rate is typically highest early and declines over the life of the bonds as the tax base grows. Water and wastewater here are reported to be delivered through a partnership with a nearby city, with residents paying the district rather than a city utility tax.

What is not established is everything a buyer would need to do the arithmetic: the current or projected district tax rate, the total bond authorisation, how much has been issued to date, and which city is the partner for water and wastewater. There is also a geometry question that nobody should gloss over. The district covers about 304.8 acres while the master plan runs 478 to 486 acres, so not every phase is necessarily inside it, and whether Phase 2's 72.062 acres sit within the district boundary could not be determined from the records read. Ask for the district boundary, the current rate and the authorised but unissued bond total in writing, because that last figure is what the rate can rise to service.

Where it is

The site address of record is 6101 Toll Bridge Road, Belton, with Toll Bridge Road and Shanklin Road as the cross streets. Toll Bridge Road forms the northwest frontage and the Lampasas River wraps the south and east sides. The interstate runs about a quarter mile to the northwest.

Approximate straight-line distances from the centre of the site: downtown Belton about four miles north, Temple ten to eleven miles northeast, Fort Cavazos around twenty miles west, Waco about forty miles north and Austin sixty to sixty-five miles south. Those are straight-line figures rather than drive times, and with the interstate this close the practical commute is usually better than the raw distance suggests.

Jurisdiction here is split, and worth being precise about. The land is unincorporated Bell County inside Belton's extraterritorial jurisdiction: Belton reviews and approves the plats, which is why the city's planning records are the authority on plat status, while the county is the addressing and taxing jurisdiction. In practice that means county services rather than city departments, no city zoning, and a utility district rather than a municipal utility bill.

Toll Bridge Road itself is being rebuilt by the developer in two phases, the first a 1.85 million dollar road and sidewalk project that now reads as inspection complete. Access work this early is a good sign about sequencing, and also a reminder that the approach will be a construction zone for some time.

The association

Ten of Phase 2's 174 lots are homeowners-association lots carrying open space and walking trails, and Phase 1A similarly set aside five of its lots. So an association is platted into the design rather than being an afterthought.

Beyond that almost nothing is of record. No management certificate for any River Farm association appears in the state database for this county, and because a Texas association must file one after its declaration records, that absence fits a declaration not yet recorded. The association's name, the declarant, the dues and whether one master association serves all eight phases are unestablished.

What is not established

Collected in one place. Who will build the homes, and therefore the product, the plan range, the square footages and the warranty. What homes will actually cost. When the Phase 2 final plat will be approved, since no date appears on the public record. When sales open, beyond a reported expectation of first homes reaching the market in 2027, with no sales-office or model-home date. The district tax rate, its bond authorisation and issuance, and whether Phase 2 lies inside the district. Which schools Phase 2 addresses will attend and whether the on-site school site becomes a funded campus. The association name, dues and restrictions. Which lots are single-family and which are patio product. Floodplain exposure, which matters here more than on most sites because the river wraps two sides, and which was not studied for this page. And the amenity delivery schedule. Two large listing aggregators are closed to automated access, so a price behind one of them could not be excluded and is recorded as unverified rather than absent.

How to use a window like this

The value of finding a community at this stage is time and information, not a discount. There is no price to negotiate and no lot to reserve. What early knowledge buys is the chance to work through the questions above while the answers are still being decided, rather than in a sales office with a release date approaching.

The questions worth asking first are the ones specific to this site. Where exactly the district boundary runs and what it will levy. Which lots are the smaller patio product. Which lots back onto the river corridor or the association open space and what the flood mapping says about them. How the trail system connects to Phase 1A. Whether the school site is going to be a school. And, when a builder is finally announced, whether that builder's plans actually fit a 3,600-square-foot lot in the way the renderings imply.

It is also worth knowing how a pre-construction purchase differs from buying a finished home, because this community will sell that way for years. The price is typically fixed at signing while the house is built over months; option selections are usually made early and are often not refundable; completion dates in builder contracts are generally targets rather than firm commitments; and financing incentives are frequently tied to the builder's affiliated lender, which is worth comparing against an independent quote.

The single thing most worth watching here is the builder announcement, because it will settle the product, the price and the timeline at once, and will likely be followed quickly by a plat recording and a first release.

Get on the River Farm Phase 2 interest list

Add your name and we will tell you what changes: when a homebuilder is announced, when the Phase 2 plat records, when a price list appears, and when lots are first released. No pressure and no obligation. Get notified when something moves.

Joining the interest list is free, creates no brokerage relationship, and does not obligate you to anything. Subdiview is operated by a real estate broker licensed in Illinois and is not licensed in Texas. Your information is referred to a real estate professional licensed in Texas, who will contact you directly and can register you as represented before your first visit to a sales office.

About this page

Subdiview publishes research pages on new-construction communities, built from the public record. This one was assembled from the City of Belton's planning records and its own published announcements, the Bell County appraisal roll and ownership layers, the county emergency-service address database, state accessibility filings, the legislative act and bill analysis creating the utility district, the state association database, dated satellite imagery, local news coverage and the developer's published material. Subdiview is operated by a real estate broker licensed in Illinois. No one at Subdiview is licensed in Texas, and Subdiview is not your agent in Texas.

We are not affiliated with Hunt Communities, with Hunt Companies, with the City of Belton, with Belton ISD, with the municipal utility district or with any homeowners association named on this page, and nothing here is authorised by them. No homebuilder is named on this page because none has been announced. Community and phase names belong to their owners and are used only to describe what the public record shows.

If you ask us for help buying here, we will refer you to a real estate professional licensed in Texas who can represent you. We are compensated by that professional's brokerage, not by you. You are free to work with anyone you like, or with no one. Nothing on this page is an offer to sell, a solicitation of an offer to buy, or financial, tax or legal advice, and facts about an unbuilt community change often. Verify anything that matters to your decision directly with the city, the county, the district and the developer before you rely on it.

Common questions

Can I buy a home in River Farm Phase 2 yet?

No. The Phase 2 final plat was still under review with the City of Belton as of 20 November 2026, and until it records the individual lots do not exist as legal parcels, so nothing can be sold or closed. No homebuilder has been named either.

What will homes cost?

Nobody has published a price. The figure that circulates traces to the developer's December 2021 land-acquisition press release, which said prices were expected to range from the low 300s to the 600s and up. That was an expectation stated five years ago by the land developer, not a builder's price list, and it does not appear on the community's own website.

Who is building the homes?

Not announced. The community's own builders page says the builders will be announced later, and local coverage reports the developer will work with its own builders and local builders without naming any. Everything about plans, square footage, warranty and actual price depends on that announcement.

How many homes are in Phase 2?

164 homesites, plus 10 homeowners-association lots for open space and trails, making 174 platted lots on 72.062 acres. That is roughly 2.3 homesites per acre, and it makes Phase 2 the largest single phase on the books so far.

Is there a municipal utility district, and what does it cost?

Yes. River Farm Municipal Utility District No. 1 of Bell County was created by the Texas Legislature in 2021 with water, sewer, drainage and road powers and the authority to issue bonds and levy taxes. The rate, the bond authorisation and how much has been issued are not established, and neither is whether Phase 2's acreage sits inside the district boundary, since the district covers about 304.8 acres of a larger master plan.

Which schools will serve Phase 2?

Belton ISD, but the specific attendance zones for Phase 2 addresses are not published. A dedicated school site sits inside the subdivision footprint according to the city's own announcement, and the district has discussed a neighbourhood school there without committing to one; no school, grade range, timeline or funding decision is of record.

Are there riverfront lots?

The tract is wrapped by the Lampasas River on its south and east sides and the developer cites river frontage among the community's attractions, but no floodplain study was obtained for this page. Flood exposure for any particular lot should be checked against the current federal flood map and the recorded plat's drainage dedication before it is relied on.